Loading...
cocc18033RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 8" Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 Mail Stop # 1080 2019-0260177 07/15/2019 03:35 PM Fee: $ 0.00 Page 1 of 5 Recorded in Official, Records County of Rlversiele Peter Aldana Assessor -County Clerk -Recorder APN 581-220-016 CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 18033 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined that its transfer on August 09, 2018 (Doc. #2018-0320435) does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) islare to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real property is located in the Count Owner(s) of Record: Walter Chatfield of Riverside, State of California described as follows: SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL Executed on — f 5 — �1 at Riverside, California L 'Ll Dernis Odenbaugh. Senior and Surveyor County of Riverside Transportation Department Juan C. Perez, P.E., T.E. Transportation and Laird Management Director COUNTY OF RIVERSIDE TRANSPORTATIONAND LAND MANAGEMENT AGENCY Transportation Department Case Number: COCC 18033 County Surveyor Riverside County Surveyor's Office $fn� Aub- SrG NATURE Gina Ness _ PRINTED NAME Senior Engineering Technician TITLE Date: 07/11/2019 Patricia Ronro, P.E. Director of Transportation Rickard G. Lauds, P.L.S. County Survevor Riverside County Surveyor's Office Attest: SIGNATURE Noah Lewis PRINTED NAME Engineering Technician II TITLE 4080 Lemon Street. 8"' Floor Riverside. CA 92501 (951) 955-6700 P.O. Box 1080 • Riverside. CA 92502-1080 FAX (951) 955-6721 EXHIBIT "A" - LEGAL DESCRIPTION CERTIFICATE OF COMPLIANCE NO. 18033 The east 416.00 feet (measured along the northernly boundary thereof) of the west 834.00 feet of the north half of Section 3, Township 8 South, Range 1 East, San Bernardino Base and Meridian; EXCEPTING THEREFROM the north 2281.00 feet thereof, AND RESERVING THEREFROM an easement for water, sewer, drainage, roads, and public utilities over the north 50.00 feet of the west 15.00 feet thereof. Record Owner(s) Address: Phone Number: Walter Chatfield 42375 Chatfield Way, Aguanga CA 92536 909-239-3339 Exhibit prepared by: Julieann Hawk Address: 3508 Albany Street, Riverside CA 92503 Phone Number: 951-662-4049 Assessor's Parcel Number(s): 581-220-016 MTU EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE NO. 18033 30' easement for road purposes and public Z utilities per INST. 72041 recorded 7/15/69 PIQ 581-220-016 - Record Owner(s): Walter Chatfield Address: 42375 Chatfield Way, Aguanga CA 92536 Phone Number: 909-239-3339 Exhibit prepared by: Julieann Hawk Address: 3508 Albany Street, Riverside CA 92503 Phone Number: 951-662-4049 Scale: N/A Assessor's Parcel Number(s): 581-220-016 Zone: N/A 07/11/19 Riverside County PLUS Page 1 10:03 CONDITIONS OF APPROVAL Plan: COCC18033 Parcel: 581220016 60. Prior To Grading Permit Issuance Transportation 060 - Transportation. 1 Submit Grading Plan Not Satisfied When you submit a grading plan to the Department of Building and Safety, 2 sets of the grading plan (24" X 36") shall be submitted to the Transportation Department for review and subsequently for the required clearance of the condition of approval prior to the issuance of a grading permit. Please note, if improvements within the road right of way are required per the conditions of approval, the grading clearance may be dependent on the submittal of street improvement plans, the opening of an IP account, and payment of the processing fee. Otherwise, please submit required grading plan to the Transportation Department, Plan Check Section, 8th Floor, 4080 Lemon Street, Riverside, CA. Standard plan check turnaround time is 10 working days. 80. Prior To Building Permit Issuance Transportation 080 - Transportation. 1 SUBMIT PLANS This condition applies if a grading permit is not required. Not Satisfied Prior to the issuance of a building permit, the owner/ applicant may be required to submit a Water Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. http://rcflood.org/npdes/ 080 - Transportation. 2 SUBMIT PLANS Not Satisfied Prior to the issuance of a building permit, the owner / applicant may be required to submit a Water Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner / applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. http://rcflood.org/npdes/ 90. Prior to Building Final Inspection Transportation 090 - Transportation. 1 WQMP COMPLETION Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs described in the Project Specific WQMP, provide an Engineer WQMP certification, GPS location of all BMPs, and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement.