cocc19019RECORDING REQUESTED E
RIVERSIDE COUNTY
When recorded, return to:
Riverside County Transportation Depa
Office of the County Surveyor
8`h Floor County Administrative Cei
4080 Lemon Street, Riverside, CA 9
Mail Stop # 1080
2019-0321207
08/21/2019 11:33 AM Fee: $ 32.00
Page 1 of 7
Recorded in Official Records
County of Riverside
Peter Aldana
Assessor -County Clerk -Recorder
1111 OF, Mg"���1 III
APN 764-150-003
CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 19019
(Section 21.2, Ordinance No. 460)
I certify that I have reviewed the following described real property and have determined that its transfer on
February 22, 2019 (Doc. #2019-0061117) does not comply with the provisions of the Subdivision Map Act and
Riverside County land division ordinances that were applicable at that time. The attached conditions) is/are to be
fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of
the property.
This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local
ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without
further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate
of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of
a permit or permits, or other grant or grants of approval.
The real property is located in the County of R
State of California described as follows:
SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL
Owner(s) of Record:
Rigoberto Regalado and Karina Regalado
Executed on 8'- 7-1 - f af at Riverside, California f1
Dennis Odenbaugh, Senior Land Surveyor
County of Riverside Transportation Department
Juan C. Perez, RE., T.E.
Transportation and Laird
Management Director
COUNTY OF RIVERSIDE
TRANSPORTATION AND
LAND MANAGEMENT AGENCY
Transportation Department
Case Number: COCC 19019
County Surveyor
Riverside County Surveyor's Office
1l"^at,4_
SIGNATURE
Gina Ness
PRINTED NAME
Senior Engineering Technician
TITLE
Date: 08/15/2019
a� of neve
Patricia Ronio, P.E.
Director of Transportation
David L. McMillan, P.L.S.
Countv Survevor
Riverside County Surveyor's Office
Attest:
SIGNATURE
Noah Lewis
PRINTED NAME
Engineering Technician II
TITLE
4080 Lemon Street. 811' Floor • Riverside. CA 92501 • (95 1) 955-6700
P.O. Box 1080 - Riverside. CA 92502-1080 FAX (951) 955-6721
C H>1 D 1 T s: ` as SHEET 1 OF 1
LEGAL DESCRIPfTION
CERTIFICATION OF COMPLIAM"'E NO. 19019
764-a5a--=
THAT PORTION OF THE WEST 1/2 OF THE NORTHWEST 1/4 OF SECTION 24, TOWNSHIP 6 SOUTH, RANGE 7
EAST, SAN BERNARDINO BASE AND MERIDIAN, DESIGNATED AS TRACT NO. 6 ON LICENSED SURVEYORS MAP ON
FILE IN BOOK 6, PAGE 35 OF RECORDS OF SURVEY, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA, DESCRIBED
AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID TRACT NO. 6; SAID CORNER BEING SOUTH 00'10'00" WEST,
1668.00 FEET FROM THE NORTHWEST CORNER OF SAID SECTION;
THENCE SOUTH 8938'00" EAST 659.12 FEET;
THENCE SOUTH 00'08'30" WEST, 332.00 FEET,
THENCE NORTH 89'38'00" WEST 659.25 FEET TO A POINT ON THE WEST LINE OF SAID SECTION 24;
THENCE NORTH 00'70'00" EAST, 332.00 FEET TO THE POINT OF BEGINNING;
EXCEPTING THE WEST 30 FEET AS CONVEYED TO THE COUNTY OF RIVERSIDE BY INSTRUMENT RECORDED APRIL
17, 1959 AS INSTRUMENT NO. 32692 OF OFFICIAL RECORDS OF RIVERSIDE COUNTY, CALIFORNIA;
ALSO EXCEPTING THAT PORTION DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID TRACT NO. 6 SAID CORNER BEING SOUTH 00'10'00" WEST,
1668.00 FROM THE NORTHWEST CORNER OF SAID SECTION,
THENCE SOUTH 89'39'00" EAST, 210.00 FEET;
THENCE SOUTH 00'10'00" WEST, PARALLEL WITH THE WEST LINE OF SAID TRACT NO. 6, 205.00 FEET TO A
POINT OF THE WEST LINE OF SAID SECTION 24;
THENCE NORTH 00'10'00" EAST, ON SAID WEST LINE, 205.00 TO THE POINT OF BEGINNING.
Q'L IAND
g7 EVEA it
4 z No.7627
F CAS
ME OR UNDER MY DIRECTION:
L.S. 7627 DATE
MAP
SHEET 1 OF 2
CERTIFICATION OF COMPLIANCE NO. 19019
I41 13 AIRPORT BOULEVARD
(PUBLIC STRFET)
.233 I �19
i
30' RIGHT-OF-WAY
i INSTRUMENT 32692 REC 4-17-59
ofcog
�pp1
�IJbV
I
,
659.12'
_S89_'38'00"E
�- 2i0.00'T
449.12'
~o
Lu
pl d
It � Apa ',032 o
PARCEL 3
a-•
`NI �1`�� 0
176,456 SQ. FT.
N
ccr)
210,00-
OR 4.05 ACRES
�
N89'38'00"E
APN : 764-150-003
®=ZZ,
o!
(VACANT LOT)
cz
U--I
----------- N89'38 00'W 659.2
Q
fl
,
�b p�pp5
!
�
I I
PPS
SEE SHEET 2 FOR OWNERS INFORMATION
AND VICINITY MAP
I
;?1PERVISION OF:
L. S. 7627
SECTION 24, T.65.:
J
U
I�P� O�pp4�
1
PPS *�pp1
�5
No. 7627
,t ;t
DATE F CAS
R. 7E., S. B. B. &M.
E1[ HIBI T�s5 B g5 SHEET 2 OF L
MAP
CERTiFiCATiON OF COMPLIANCE NO. 19019
AIRPORT BOULEVARD
SITE
W
0
JACQUELINE COCHRAN
REGIONAL AIRPORT
58TH AVENUE
ti
0
w
z
0
AVENUE 60
w
w
VICINITY ,P
NOT TO SCALE
OWNER EXISTING ZONING ,4PN NUMBER
Name: Ri�berfo &Karina
Regalado _
ZONE A-1
764-150-003
Address: 83215 Choate Court
City,State,Zip: Therm CA 92274
Phone Number: 760-641-4463
08/15/19 Riverside County PLUS Paqe 1
10:33 CONDITIONS OF APPROVAL
Plan: COCC19019
60. Prior To Grading Permit Issuance
Parcel: 764150003
Survey
060 - Survey. 1 R O W DEDICATION Not Satisfied
Sufficient public street right of way along Jackson Street (project boundary) shall be convey for public
use to provide for a 64 foot half width right of way per County Standard No. 92, Ordinance 461.
Transportation
060 - Transportation. 1 Submit Grading Plan
Not Satisfied
When you submit a grading plan to the Department of Building and Safety, 2 sets of the grading plan
(24" X 36") shall be submitted to the Transportation Department for review and subsequently for the
required clearance of the condition of approval prior to the issuance of a grading permit. Please note,
if improvements within the road right of way are required per the conditions of approval, the grading
clearance may be dependent on the submittal of street improvement plans, the opening of an IP
account, and payment of the processing fee. Otherwise, please submit required grading plan to the
Transportation Department, Plan Check Section, 8th Floor, 4080 Lemon Street, Riverside, CA.
Standard plan check turnaround time is 10 working days.
060 - Transportation. 2 SUBMIT PLANS
Not Satisfied
Prior to the issuance of a grading permit, the owner / applicant may be required to submit a Water
Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the
parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is
determined that a WQMP is required, the owner/applicant shall be required to submit a WQMP and
associated plans for review and approval prior to the issuance of a grading permit. More information
can be found at the following website.
http://rcflood.org/npdes/
80. Prior To Building Permit Issuance
Survey
080 - Survey. 1 R O W DEDICATION Not Satisfied
Sufficient public street right of way along Jackson Street (project boundary) shall be convey for public
use to provide for a 64 foot half width right of way per County Standard No. 92, Ordinance 461.
Transportation
080 - Transportation. 1 Payment of Transportation Fees (CVAG) Not Satisfied
Prior to the issuance of a building permit, the project proponent shall pay the Transportation Uniform
Mitigation Fee (TUMF) in accordance with the fee schedule in effect at the time of issuance, pursuant
to Ordinance No. 673.
080 - Transportation. 2 SUBMIT PLANS Not Satisfied
This condition applies if a grading permit is not required.
Prior to the issuance of a building permit, the owner / applicant may be required to submit a Water
Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the
parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is
determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and
08/15/19 Riverside County PLUS Page 2
10:33 CONDITIONS OF APPROVAL
Plan: COCC19019
80. Prior To Building Permit Issuance
Transportation
Parcel: 764150003
080 - Transportation. 2 SUBMIT PLANS (cont.) Not Satisfied
associated plans for review and approval prior to issuance of building permit. More information can be
found at the following website.
http://rcflood.org/npdes/
90. Prior to Building Final Inspection
Transportation
090 - Transportation. 1 WQMP COMPLETION Not Satisfied
If the project proposes to exceed the impervious thresholds found in the WQMP guidance document,
the applicant will be required to acceptably install all structural BMPs described in the Project Specific
WQMP, provide an Engineer WQMP certification, GPS location of all BMPs, and ensure that the
requirements for permanent inspection and maintenance the BMPs are established with a BMP
maintenance agreement.