Loading...
cocc19024RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 8"' Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 Mail Stop # 1080 2019-04.2268 11/15/2019 09:56 AM Fee: $ 0.00 page 1 of 6 Recorded in Official Records County of Riverside P eter Aldana Assessor -County Clerk -Recorder 111191 01AT11 III Otv APN CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 19024 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined that its transfer on August 27, 2019 (Doc. #2019-0330395) does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real property is located in the County of Riverside, State of California described as follows: SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL Owner(s) of Record: Nelda Selene Reyes Longoria and Marco Antonio Moreno Rodriguez Executed on at Riverside, California Dennis Odenbaugh, Senior Laril Surveyor County of Riverside Transportation Department Juan C. Perez, P.E., T.E. Transportation and Land Management Director COUNTY OF RIVERSIDE TRANSPORTATIONAND LAND MANAGEMENT AGENCY Transportation Department Case Number: COCC 19024 County Surveyor Riverside County Surveyor's Office )14�4 011K, SIGNATURE Gina Ness PRINTED NAME Senior Engineering Technician TITLE Date: 11/13/2019 OF n r 'y ����TlON 0641 Patricia Romo, P.E. Director of Transportation Richard G. Lanus, P.L.S. Countv Survevor Riverside County Surveyor's Office Attest: SIGNATURE Noah Lewis PRINTED NAME Engineering Technician II TITLE 4080 Lemon Street 81h Floor - Riverside, CA 92501 - (951) 955-6700 P.O. Box 1080 Riverside, CA 92502-1080- FAX (951) 955-6721 EXHIBIT "A" - LEGAL DESCRIPTION CERTIFICATE OF COMPLIANCE NO. 19024 LEGAL DESCRIPTION Real property in the unincorporated area of the County of Riverside, State of California, described as follows: THE NORTH ONE-HALF OF LOT 78 IN HOMELAND NO. 2 AS SHOWN BY MAP ON FILE IN BOOK 13, AT PAGE 74 OF MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA, AMENDED PURSUANT TO THAT CERTAIN CERTIFICATE OF CORRECTION RECORDED OCTOBER 1, 1973 AS INSTRUMENT NO. 128613 OF OFFICIAL RECORDS. APN:459-212-027-2 Record Owner(s): Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez Address: 32165 Snyder Lane, Homeland CA 92548 .Phone Number: _ (951) 418-1064 Exhibit prepared by: Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez Address: 32165 Snyder Lane, Homeland CA 92548 Phone Number: (951) 418-1064 Assessor's Parcel Number(s): 459-212-027 Form 295-1014(03123115) EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE NO. 19024 LOT 79 MB 13/74 170' N 1/2 LOT 78 MB 13/74 Vicinity Map Allen Ave. c � m c > c Y y m O O Record Owner(s): Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez Address: 32165 Snyder Lane, Homeland CA 92548 Phone. Number: (951) 418-1064 Exhibit prepared by: Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez Address: 32165 Snyder Lane, Homeland CA 92548 Phone Number: (951) 418-1064 Scale: N/A Assessor's Parcel Number(s): 459-212-027 Zone: R -R Zone 0.20 Acres+/- 0 0 o 459-212-027 N a 170' 11/13/19 Riverside County PLUS Page 1 09:32 CONDITIONS OF APPROVAL Plan: COCC19024 60. Prior To Grading Pcrmit Issuancc Transportation 060 - Transportation. 1 Submit Grading Plan Parcel: 459212027 Not Satisfied When you submit a grading plan to the Department of Building and Safety, 2 sets of the grading plan (24" X 36") shall be submitted to the Transportation Department for review and subsequently for the required clearance of the condition of approval prior to the issuance of a grading permit. Please note, if improvements within the road right of way are required per the conditions of approval, the grading clearance may be dependent on the submittal of street improvement plans, the opening of an IP account, and payment of the processing fee. Otherwise, please submit required grading plan to the Transportation Department, Plan Check Section, 8th Floor, 4080 Lemon Street, Riverside, CA. Standard plan check turnaround time is 10 working days. 060 - Transportation. 2 SUBMIT PLANS Not Satisfied Prior to the issuance of a grading permit, the owner / applicant may be required to submit a Water Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner/applicant shall be required to submit a WQMP and associated plans for review and approval prior to the issuance of a grading permit. More information can be found at the following website. http://rcflood.org/npdes/ 80. Prior To Building Permit Issuance Transportation 080 - Transportation. 1 SUBMIT PLANS This condition applies if a grading permit is not required. Not Satisfied Prior to the issuance of a building permit, the owner / applicant may be required to submit a Water Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. http://rcflood.org/npdes/ 90. Prior to Building Final Inspection Transportation 090 - Transportation. 1 WQMP COMPLETION Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs described in the Project Specific WQMP, provide an Engineer WQMP certification, GPS location of all BMPs, and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 - Transportation. 2 WRCOG TUMF Not Satisfied Prior to the issuance of an occupancy permit, the project proponent shall pay the Transportation Uniform Mitigation Fee (TUMF) in accordance with the fee schedule in effect at the time of issuance, pursuant to Ordinance No. 824. 11/13/19 Riverside County PLUS Paqe 2 09:32 CONDITIONS OF APPROVAL Plan: COCC19024 90. Prior to Building Final Inspoction Transportation 090 - Transportation. 2 WRCOG TUMF (cont.) Parcel: 459212027 Not Satisfied