cocc19024RECORDING REQUESTED BY
RIVERSIDE COUNTY
When recorded, return to:
Riverside County Transportation Department
Office of the County Surveyor
8"' Floor County Administrative Center
4080 Lemon Street, Riverside, CA 92501
Mail Stop # 1080
2019-04.2268
11/15/2019 09:56 AM Fee: $ 0.00
page 1 of 6
Recorded in Official Records
County of Riverside
P
eter Aldana
Assessor -County Clerk -Recorder
111191 01AT11 III
Otv
APN
CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 19024
(Section 21.2, Ordinance No. 460)
I certify that I have reviewed the following described real property and have determined that its transfer on
August 27, 2019 (Doc. #2019-0330395) does not comply with the provisions of the Subdivision Map Act and
Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be
fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of
the property.
This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local
ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without
further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate
of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of
a permit or permits, or other grant or grants of approval.
The real property is located in the County of Riverside, State of California described as follows:
SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL
Owner(s) of Record:
Nelda Selene Reyes Longoria and Marco Antonio Moreno Rodriguez
Executed on at Riverside, California
Dennis Odenbaugh, Senior Laril Surveyor
County of Riverside Transportation Department
Juan C. Perez, P.E., T.E.
Transportation and Land
Management Director
COUNTY OF RIVERSIDE
TRANSPORTATIONAND
LAND MANAGEMENT AGENCY
Transportation Department
Case Number: COCC 19024
County Surveyor
Riverside County Surveyor's Office
)14�4 011K,
SIGNATURE
Gina Ness
PRINTED NAME
Senior Engineering Technician
TITLE
Date: 11/13/2019
OF
n
r
'y
����TlON 0641
Patricia Romo, P.E.
Director of Transportation
Richard G. Lanus, P.L.S.
Countv Survevor
Riverside County Surveyor's Office
Attest:
SIGNATURE
Noah Lewis
PRINTED NAME
Engineering Technician II
TITLE
4080 Lemon Street 81h Floor - Riverside, CA 92501 - (951) 955-6700
P.O. Box 1080 Riverside, CA 92502-1080- FAX (951) 955-6721
EXHIBIT "A" - LEGAL DESCRIPTION
CERTIFICATE OF COMPLIANCE NO. 19024
LEGAL DESCRIPTION
Real property in the unincorporated area of the County of Riverside, State of California, described as
follows:
THE NORTH ONE-HALF OF LOT 78 IN HOMELAND NO. 2 AS SHOWN BY MAP ON FILE IN BOOK 13, AT
PAGE 74 OF MAPS, RECORDS OF RIVERSIDE COUNTY, CALIFORNIA, AMENDED PURSUANT TO THAT
CERTAIN CERTIFICATE OF CORRECTION RECORDED OCTOBER 1, 1973 AS INSTRUMENT NO. 128613
OF OFFICIAL RECORDS.
APN:459-212-027-2
Record Owner(s): Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez
Address: 32165 Snyder Lane, Homeland CA 92548
.Phone Number: _ (951) 418-1064
Exhibit prepared by: Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez
Address: 32165 Snyder Lane, Homeland CA 92548
Phone Number: (951) 418-1064
Assessor's Parcel Number(s): 459-212-027
Form 295-1014(03123115)
EXHIBIT "B" - MAP
CERTIFICATE OF COMPLIANCE NO. 19024
LOT 79 MB 13/74
170'
N 1/2 LOT 78 MB 13/74
Vicinity
Map
Allen Ave.
c �
m
c > c
Y y m
O O
Record Owner(s): Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez
Address: 32165 Snyder Lane, Homeland CA 92548
Phone. Number: (951) 418-1064
Exhibit prepared by: Nelda Selene Reyes Longoria & Marco Antonio Moreno Rodriguez
Address: 32165 Snyder Lane, Homeland CA 92548
Phone Number: (951) 418-1064
Scale: N/A
Assessor's Parcel Number(s): 459-212-027
Zone: R -R Zone
0.20 Acres+/-
0
0
o
459-212-027
N
a
170'
11/13/19 Riverside County PLUS Page 1
09:32 CONDITIONS OF APPROVAL
Plan: COCC19024
60. Prior To Grading Pcrmit Issuancc
Transportation
060 - Transportation. 1 Submit Grading Plan
Parcel: 459212027
Not Satisfied
When you submit a grading plan to the Department of Building and Safety, 2 sets of the grading plan
(24" X 36") shall be submitted to the Transportation Department for review and subsequently for the
required clearance of the condition of approval prior to the issuance of a grading permit. Please note,
if improvements within the road right of way are required per the conditions of approval, the grading
clearance may be dependent on the submittal of street improvement plans, the opening of an IP
account, and payment of the processing fee. Otherwise, please submit required grading plan to the
Transportation Department, Plan Check Section, 8th Floor, 4080 Lemon Street, Riverside, CA.
Standard plan check turnaround time is 10 working days.
060 - Transportation. 2 SUBMIT PLANS
Not Satisfied
Prior to the issuance of a grading permit, the owner / applicant may be required to submit a Water
Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the
parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is
determined that a WQMP is required, the owner/applicant shall be required to submit a WQMP and
associated plans for review and approval prior to the issuance of a grading permit. More information
can be found at the following website.
http://rcflood.org/npdes/
80. Prior To Building Permit Issuance
Transportation
080 - Transportation. 1 SUBMIT PLANS
This condition applies if a grading permit is not required.
Not Satisfied
Prior to the issuance of a building permit, the owner / applicant may be required to submit a Water
Quality Management Plan (WQMP), on one PDF on two CD copies, if the development of the
parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is
determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and
associated plans for review and approval prior to issuance of building permit. More information can be
found at the following website.
http://rcflood.org/npdes/
90. Prior to Building Final Inspection
Transportation
090 - Transportation. 1 WQMP COMPLETION
Not Satisfied
If the project proposes to exceed the impervious thresholds found in the WQMP guidance document,
the applicant will be required to acceptably install all structural BMPs described in the Project Specific
WQMP, provide an Engineer WQMP certification, GPS location of all BMPs, and ensure that the
requirements for permanent inspection and maintenance the BMPs are established with a BMP
maintenance agreement.
090 - Transportation. 2 WRCOG TUMF Not Satisfied
Prior to the issuance of an occupancy permit, the project proponent shall pay the Transportation
Uniform Mitigation Fee (TUMF) in accordance with the fee schedule in effect at the time of issuance,
pursuant to Ordinance No. 824.
11/13/19 Riverside County PLUS Paqe 2
09:32 CONDITIONS OF APPROVAL
Plan: COCC19024
90. Prior to Building Final Inspoction
Transportation
090 - Transportation. 2 WRCOG TUMF (cont.)
Parcel: 459212027
Not Satisfied