953o_gr2M GENERAL NOTES: 1. EROSION CONTROL IS REQUIRED FOR GRADING OPERATIONS DURING THE RAINY SEASON, FROM OCTOBER 15 TO APRIL 15, APPROVED PLANS ARE REQUIRED FOR ALL ROUGH GRADING. 2. IN CASE OF EMERGENCY CALL STOCKDALE INVESTMENT GROUP, INC. AT (949) 454-7109. 3. THE DESIGN CML ENGINEER WILL SUPERVISE EROSION CONTROL WORK AND INSURE THAT WORK IS IN ACCORDANCE WITH THE APPROVED PLANS (IF REQUIRED). 4. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON THE SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. 5. DEVICES SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE COUNTY. 6. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE 5 -DAY RAIN PROBABILTY FORCAST EXCEEDS 40X. 7. AFTER A RAINSTORM, ALL SILT AND DEBRIS SHALL BE REMOVED FROM CHECK BERMS, SILT FENCES, AND DESILTING BASINS ETC. 8. GRADING AREAS AROUND THE TRACT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9. THE CONTRACTOR SHALL BE RESPONSIBLE AND SWILL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A HARARDOUS CONDITION. 10. DESIL71NG BASINS ARE TO BE CONSTRUCTED AS GRADING OF INDIVIDUAL GRADING AREAS ARE COMPLETE PER ROUGH GRADING PLANS. 11. THE DESIGN CML ENGINEER RESERVES THE RIGHT TO MAKE CHANGES OR MODIFICATIONS TO THE PLAN AS DEEMED NECESSARY. 12. INFORMATION ON THIS PLAN IS FOR EROSION CONTROL ONLY. ALL OTHER INFORMATION IS SUBJECT TO CHANGE. 13. TEMPORARY EROSION PROTECTION IS REQUIRED FOR MANUFACTURED SLOPES PRIOR TO PERMANENT PLANTING. 14. AREAS SHALL BE MAINTAINED IN SUCH A STATE THAT FIRE ACCESS SHALL BE MAINTAINED AT ALL TIMES (INCLUDING ACCESS TO NEIGHBORING PROPERTIES). 15. NO OBSTRUCTION OR DISTURBANCE OF NATURAL DRAINAGE COURSES OR EXISTING STORM DRAIN INLETS SHALL OCCUR DURING THE RAINING SEASON, UNLESS ADEQUATE TEMPORARY/PERMANENT DRAINAGE FACILITIES HAVE BEEN APPROVED AND INSTALLED TO CARRY SURFACE WATER TO THE NEAREST PRACTICAL STREET, STORM DRAIN OR NATURAL WATER COURSE. 16. THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS IN SUCH A MANNER THAT STORM RUNOFF WILL BE CONTAINED WITHIN THE PROJECT OR CHANNELED INTO THE STORM DRAIN SYSTEM WHICH SERVES THE RUNOFF AREA. STORM RUNOFF FROM ONE AREA SHALL NOT BE ALLOWED TO DIVERT TO ANOTHER RUNOFF AREA. 17. CONFORMANCE WITH THE REQUIREMENTS OF THESE PLANS SHALL IN NO WAY RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES TO THIS SITE AND ADJACENT PROPERTIES. TEMPORARY EROSION CONTROL SHAD. CONSIST OF, BUT NOT BE LIMITED TO, CONSTRUCTING SUCH FACILITIES AND TAKING SUCH MEASURES AS ARE NECESSARY TO PREVENT, CONTROL AND ABATE WATER, MUD AND EROSION DAMAGE TO PUBLIC AND PRIVATE PROPERTY AS RESULT OF THE CONSTRUCTION OF THIS PROJECT. 18. SLOPES CONSTRUCTED PRIOR TO OCTOBER 1 SHALL BE TREATED FOR EROSION CONTROL PRIOR TO OCTOBER 15. SLOPES CONTRUCTED AFTER OCTOBER 1 SHALL BE TREATED FOR EROSION CONTROL AS THE CONTRUCTION OF SLOPE PROGRESSES IN INCREMENTS OF 25 FEET OR LESS, MEASURED VERTICALLY, 19. FILL AREAS, WHILE BEING BROUGHT UP TO GRADE AND DURING PERIODS OF COMPLETION PRIOR TO FINAL GRADE, SHALL. BE PROTECTED BY VARIOUS MEASURES TO ELIMINATE EROSION AND THE SILTATION OF DOWNSTREAM FACILITIES AND ADJACENT AREAS. THESE MEASURES MAY INCLUDE, BUT SHALL NOT BE LIMITED TO. TEMPORARY DOWNDRAINS, EITHER IN THE FORM OF PIPES OR PAVED DITCHES WITH PROTECTED OUTFALL AREAS; GRADED BERMS AROUND AREAS TO ELIMINATE EROSION OF FILL SLOPES BY SURFACE RUNOFF; CONFINED PONDING AREAS TO DESILT RUNOFF; TEMPORARY CHECK DAMS IN TOE OF SLOPE DITCHES TO DESILT RUNOFF, PROTECTION SUCH AS SAND BAGS AROUND INLETS WHICH HAVE NOT BEEN BROUGHT UP TO GRADE; AND EARTH BERMS AND APPROPRIATE GRADING TO DIRECT DRAINAGE AWAY FROM THE EDGE OF THE TOP OF SLOPES SHALL BE CONSTRUCTED AND MAINTAINED ON THOSE FILL AREAS WHERE EARTHWORK OPERATIONS ARE NOT IN PROGRESS. 20. TOP OF CUT BROW DITCHES, WHERE REQUIRED ON THE PLANS, SHALL BE CONSTRUCTED PRIOR TO EXCEEDING 12 FEET OF CUT MEASURED VERTICALLY. 21. CLEARING AND GRUBBING SHOULD BE LIMITED TO AREAS THAT WILL RECEIVE IMMEDIATE GRADING. EROSION CONTROL MEASURES WILL BE REQUIRED TO PROTECT AREAS WHICH HAVE BEEN CLEARED AND GRUBBED PRIOR TO GRADING OPERATION, AND WHICH ARE SUBJECT TO RUNOFF DURING THE PERIOD OF THE RAINY SEASON. THESE MEASURES MAY INCLUDE, BUT ARE NOT LIMITED TO. GRADED DITCHES; BRUSH BARRIERS AND SILT FENCES. CARE SHALL BE EXERCISED TO PRESERVE VEGETATION BEYOND LIMITS OF GRADING. 22. COUNTY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE CORRECTION OF ERROR AND OMISSION DISCOVERED DURING CONSTRUCTION. UPON REQUEST, THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE COUNTY FOR APPROVAL. OMER OVER ENGINEER IN CASE OF E(,OODING, CONTACT: STOCKDALE INVESTMENT GROUP, INC. ALIARD ENGINEERING KEN BORJA 26000 COMMERCE CENTER DRIVE 8253 SIERRA AVENUE SR. V.P. LAKEFOREST, OR ST,1CA 09 92630 FONTANA, CA 92335 STOCKDALE INVESTMENT GROUP, (909) 356-1815 INC. 26000 LAKE FOREST, CA. 92630 DEVELOPER 949-454-7124 STOCKDALE INVESTMENT GROUP, INC. 26000 COMMERCE CENTER DRIVE LAKE FOREST, CA 92630 (949) 454-7109 PRIVATE MaNEER'S NOW TO CONTRACTOR: --------------------- ------ - R/W 2' THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY SEARCH OF THE AVAILABLE RECORDS. THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER LINES SHOWN AND ANY OTHER LINES NOT AN RECORD OR NOT SHOWN ON THESE PLANS. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL. HARMLESS FROM ANY AND ALL LABILITY, REAL. OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL. UNAUTHORIZED CHANGES do USES. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE ENGINEER PREPARING THESE PLANS. � AITD L _V N.T.S. PROPOSED CATCH BASIN PROPOSED CURB AND GUTTER EROSION CONTROL PLAN ,'T1AIMll PARCEL MAP 33617 LEGEND CXDC: oo GRAVEL BAGS DIRECTION OF FLOW FIBER ROLL FlLWA 9RIC TO VeerfiiLml 3pacsng measured aflang they face of tle slop: VI between rr" aid 20, AND AT TOE OF SLOPE \, z FILTER FABRIC GRAPHIC SCALE (INIHT) 1 M Is 60 FT. COVER CURBVOPwNING CURB QPEN�NG D SALTER �STAPUZED GoN$JRUMON EN ENTRANCE DETA-d NISNTS NOTE: MINIMUM 1 REQUIRED PROJECT LOCATION Note, Ingiuln fiber rdl ellonq a Ie"F ct' tSvr' 4 InsI a tlLe" r.eo neas slope WI It .rons3tivis into a steeperSlope A VICINITY MAP T.2S., R.51N. (NO SECTION - PORTION OF RANCHO JARUPA) N. T.S. IMDIQ NO• 36719 100' MINIMUM 2 AX M GRAVEL BAG SWUNG LAYOUT DETAIL or NIS , •1 DETAIL NTS CURB EROSION CONTROL. CONSTRUE NOTES O1 INSTALL GRAVEL BAGS PER DETAIL "A, B. do C" , ON THIS SHEET O INSTALL GRAVEL BAGS PER DETAIL "D" , ON THIS SHEET 0 CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE PER DETAIL "E" ON THIS SHEET ® INSTALL FIBER ROLLS BCRO90103 IP090058