cr16_0850NO'I']CE: Filing this Corner Record does not relieve you of frling rr Record o/Stoney ud+en it is required hr the Land Surveyors Act.
' 't6i VCR [ACCORD
Document Number5„/Q.—_-----
City of LAKE6I.,SINORU County of RIVERSIDE; ____ California
Brief Legal Description: TIB OUT CUN FRLINU MONUMENT AT PO_CI1'RY & MAIN STREET PRIOR TO
CONSTRUCTION, SEC, 5 _1'.65.. RAW., S.B.M.
(Include' Sec Twp Rge. and Meridian or Rancho)
CORNERTYPE
❑ Government Corner ❑ Control
❑ Meander ❑ Property
❑ Rancho R Other
0 Date of Survcy JUNE: 2016
N. _
Zone
Elev.
COORDINATES
(Optional)
Datum
Cornet, - ❑ Left as found 0 Pound and lagged ❑ Established ❑ Reestablished ❑ Rebuilt
Identification and type of corner found: Evidence used to identify or procedure used to establish or recstablish the corner:
POUND MONUMENT AS NOTED. ITIS THE, PURPOSE OF "PFIIS CORNER RECORI>'I'O PURPE'I'UA'IE'I'I'IFi EXIS"TING
CORNER POSITION AS POUND ON JANUARY 15, 2016. A I'OS"f-CONSTRUCTION VISIT "I'O'rl IU-CORNL;R POSITION
ON JUNE 29, 2016, POUND TIDE CORNER AS SHOWN.--.1--
A
HOWN._._.__
A description of the physical condition of the monument as found and as set or reset:
SURVEYOR'S SI'ATEMEN'r
This Corner Record was prepared by me or under my direction in conformance with the
Land Sgrvt,yo Act on-__.TUNU 29, 2016.
Signed _ L.S. Number
COUNTY SURVEYOR'S STATEMEN'r
This Caner Record was received
2016, and examined
and filed J_% 2016. {^
Signed ' I'itle�w,iY�.1v�Via�e-/
County Surveyor's Comment-
-
A.P.N.
(Optional: I,or,(dare inde ing)
Page i of I
i`9V�VALI000OOUDTOIOOCAOdWSI Ilil�lfiComa Record Shcns I rCurncrRccoM10P2 1'mlcu-M,sin.doc
2)1
No. 7611
1
CXp,12-
.�.« , -,-I
Document Number 11—w-4` 8..'
LEGEND
INDICATES FOUND LEAD & TACK, FLUSH IN TOP OF
CURB PER CR #11--0549.
INDICATES FOUND MAGNAII.. & WASHER, LS 5346,
FLUSH PER CR N11-0549.
O INDICATES RECORD DATA PER
CORNER RECORD N0. 11-0549.
DAVID EVAN
ANDASS®CIATES INC_.
4200 Concours, Suite 150
ON40 Ontario California 91764
Phone: 909,401.5750
FOUND AS NOTED JANUARY 15, 2016 FOR
PRE—CONSTRUCTION VERIFICATION.
VERIFIED POSI110N POST—CONSTRUCTION
ON JUNE 29, 2016
Poge 2 o1 2
v