Loading...
cr16_0850NO'I']CE: Filing this Corner Record does not relieve you of frling rr Record o/Stoney ud+en it is required hr the Land Surveyors Act. ' 't6i VCR [ACCORD Document Number5„/Q.—_----- City of LAKE6I.,SINORU County of RIVERSIDE; ____ California Brief Legal Description: TIB OUT CUN FRLINU MONUMENT AT PO_CI1'RY & MAIN STREET PRIOR TO CONSTRUCTION, SEC, 5 _1'.65.. RAW., S.B.M. (Include' Sec Twp Rge. and Meridian or Rancho) CORNERTYPE ❑ Government Corner ❑ Control ❑ Meander ❑ Property ❑ Rancho R Other 0 Date of Survcy JUNE: 2016 N. _ Zone Elev. COORDINATES (Optional) Datum Cornet, - ❑ Left as found 0 Pound and lagged ❑ Established ❑ Reestablished ❑ Rebuilt Identification and type of corner found: Evidence used to identify or procedure used to establish or recstablish the corner: POUND MONUMENT AS NOTED. ITIS THE, PURPOSE OF "PFIIS CORNER RECORI>'I'O PURPE'I'UA'IE'I'I'IFi EXIS"TING CORNER POSITION AS POUND ON JANUARY 15, 2016. A I'OS"f-CONSTRUCTION VISIT "I'O'rl IU-CORNL;R POSITION ON JUNE 29, 2016, POUND TIDE CORNER AS SHOWN.--.1-- A HOWN._._.__ A description of the physical condition of the monument as found and as set or reset: SURVEYOR'S SI'ATEMEN'r This Corner Record was prepared by me or under my direction in conformance with the Land Sgrvt,yo Act on-__.TUNU 29, 2016. Signed _ L.S. Number COUNTY SURVEYOR'S STATEMEN'r This Caner Record was received 2016, and examined and filed J_% 2016. {^ Signed ' I'itle�w,iY�.1v�Via�e-/ County Surveyor's Comment- - A.P.N. (Optional: I,or,(dare inde ing) Page i of I i`9V�VALI000OOUDTOIOOCAOdWSI Ilil�lfiComa Record Shcns I rCurncrRccoM10P2 1'mlcu-M,sin.doc 2)1 No. 7611 1 CXp,12- .�.« , -,-I Document Number 11—w-4` 8..' LEGEND INDICATES FOUND LEAD & TACK, FLUSH IN TOP OF CURB PER CR #11--0549. INDICATES FOUND MAGNAII.. & WASHER, LS 5346, FLUSH PER CR N11-0549. O INDICATES RECORD DATA PER CORNER RECORD N0. 11-0549. DAVID EVAN ANDASS®CIATES INC_. 4200 Concours, Suite 150 ON40 Ontario California 91764 Phone: 909,401.5750 FOUND AS NOTED JANUARY 15, 2016 FOR PRE—CONSTRUCTION VERIFICATION. VERIFIED POSI110N POST—CONSTRUCTION ON JUNE 29, 2016 Poge 2 o1 2 v