Loading...
r19_25e_135_a45 --A i TOWNSHIP 4 SOUTH, RANGE 23 EAST, OF THE SAN BERNARDINO MERIDIAN, CALIFORNIA. DEPENDENT RESURVEY N69 y a\ � \ \ \ Sec. 3 Mean Magnetic Declination 15° East \ �•a,. STANDARD Z \\ NCO O r J,. \` 4e \ 9 I h .. S. 99 FA 7 \ o \\ \ W Sec. 10 \N m 4l1 o \ •• =IAJl \ \ 1. % o \ moo::: Sec. 15 2 \ \ O. o \ 2, i, /\ / Sec. 22 / / / / Sec. 27 / / �!v / y 0 Timber in this area consists of ironwood, / mesquite, and willow. / / us ads� Tosco This plat represents a retracement and reestablishment of a portion of the First Standard Parallel South, a portion of the subdivisional lines, and the meander lines designed to restore the corners in their true original location to the best available evidence. The areas and designations are as shown on the plat approved May 22, 1879. A portion of the First Standard Parallel South was surveyed by 0. P. Calloway in 1874. A portion of the First Standard Parallel South, a portion of the subdivisional lines and all of the meander lines were surveyed by W. F. Benson in 1879. The portion of the First Standard Parallel South, west of the standard corner of sections 1 and 2, T. 5 S.,, R. 23 E. was resurveyed and surveyed by W. J. Lightfoot in 1916. Dependent resurvey of a portion of the First Standard Parallel South, a portion of the subdivisional lines, and the meander lines of T. 4 S., R. 23 E., S. B. M., California, executed by Leland P. Lewis, February 20, 1958 to March 27, 1958, under Special Instructions dated February 17, 1958, which provide for the surveys included under Group 445, California. Sec. 36 NORTH 12.35 40.35 ' NB9 ° 52E. y Q 17.97: EAST STANDARD 5 9 PARALLEL Sec. I / i 0 510 20 40 80 Scale in Ghalns Area resurveyed: 3 acres j Iw 1 1 ` \\ _sec \ I \ n I 3 40. P' a/ / Iz SA. 1 4 / q EAST 5 0 , , 40.00 " 1 �yt 5 �G 1 11 1 1 I ?�, 1 'z Sec . \ a \ -�- r a S.89 'E I EA S;r 4 (20.00) 33.4101 W\ 4101 1 ` 12 Sec. 1 26 1' <. \I 3 e S.89 i N.89 40.90 (20.2 34.41/ i' I I i i ? 'Sec 135_ I I I I a FIRST Sec. 2 / Sec. 34 J / Latitude 33 Longitude 114 0 32.6 W. / 5 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Washington, D. C. July 22, 1958 This plat is strictly conformable to the approved field notes, and the survey, having been correctly SOUTH executed in accordance with the requirements of law and the regulations of this Bureau, is hereby accepted. p For the Director Cadastral Engineering Staff ficer GPO 88.1400 EAS •``'40.134 �� � ,t30.� 2 3 O r J,. g 4 S'ec. I h .. S. 99 FA 7 j Iw 1 1 ` \\ _sec \ I \ n I 3 40. P' a/ / Iz SA. 1 4 / q EAST 5 0 , , 40.00 " 1 �yt 5 �G 1 11 1 1 I ?�, 1 'z Sec . \ a \ -�- r a S.89 'E I EA S;r 4 (20.00) 33.4101 W\ 4101 1 ` 12 Sec. 1 26 1' <. \I 3 e S.89 i N.89 40.90 (20.2 34.41/ i' I I i i ? 'Sec 135_ I I I I a FIRST Sec. 2 / Sec. 34 J / Latitude 33 Longitude 114 0 32.6 W. / 5 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Washington, D. C. July 22, 1958 This plat is strictly conformable to the approved field notes, and the survey, having been correctly SOUTH executed in accordance with the requirements of law and the regulations of this Bureau, is hereby accepted. p For the Director Cadastral Engineering Staff ficer GPO 88.1400