Loading...
r19_25e_135_cTOWNSHIP 4 SOUTH, RANGE 23 EAST, OF THE SAN BERNARDINO MERIDIAN, CALIFORNIA. CORRECTION SURVEY OF SECTION 36 EAST -76.43 L I ✓1. 1 10 5 0 10 20 30 40 Chains S. L T. This plat represents a correction survey of accretion lands within section 36 and their division between vested and public land interests therein. The original surveys were executed by 0. P. Calloway, in 1874, and by W. F. Benson, in 1879, as shown upon the plat approved May 22, 1879. The sections adjoining the right bank of the Colorado River, as originally surveyed, and the adjusted record meander line of the right bank, were resurveyed by Leland P. Lewis, Cadas- tral Surveyor, under Group 445, as shown upon the plat accepted July 22, 1958. The accretion land fronting the township was surveyed by Harold D. Corbin, Cadas- tral Surveyor, under Group 459, as shown upon the plat accepted May 21, 1962. These latter surveys, as they affected lands within section 36, were suspended by memorandum dated January 27, 1964 (6.05a, Group 459, California), in conformance with the opinion of the Associate Solicitor dated January 6, 1964 (J -61 -2003 .10). Except as new areas are shown hereon, the lottings and areas are as shown upon the plats referred to. These surveys were executed by Donald A. Cannon, Cadas- tral Surveyor, from April 23 to May 5, 1964, pursuant to Special Instructions dated March 25,1964, for Group No. 459. UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Washington, D. C. October 28, 1964 This plat is strictly conformable to the approved field notes, and the survey, having been correctly ex- ecuted in accordance with the requirements of law and the regulations of this Bureau, is hereby accepted. For the Director Acting Chief, Division of Engineering f i