r19_25e_152vil
0
0
0
0
N
470,000 +
I,
U)
a
0
9
33° 25'
T. 9 S.
33° 20'
0
0
410,000 +
I
H. W.
KT
Q
N
CALIFORNIA PROTRACTION DIAGRAM
T. 9 S., Rs.10 a I I E., S. B. Mer.
BUREAU OF LAND MANAGEMENT
CALIFORNIA STATE OFFICE - DIVISION OF ENGINEERING
SACRAMENTO, CALIFORNIA
R. 10 E. R. I I E.
SECOND STANDARD PARALLEL SOUTH
I .. SALTON"
011110, 1894 Q Lot 33 25' 51.347 ° N.
79, 994 61.30 Long. 115 48' 53.277 "W.
o ze.r9z 79.494 79.994 79.994 79.994 79.994 na3 80.00 80.0 60.86
790994 9.994 79.994 T9.494 79.994 79.994 81.07 T 81.71 %T
I �' -. T 617x:
6 ................... Group 335, 1942 -----------
33 25' a (321} 640) 1 , (640) I (639) — (640] I (640)
4000 4 I I I ro
80.15 !40.01 I (79.89) i (79.87) (80.!!1 1 (80.03) o (8/,43)
79.951
x 4 . 80) I 1
18 0 9 1 10 1 11 I 12 ..<.< ti
° I (182) Y
79.96 79.89 — (79.B7) i (0000, — — — 4000 '
(BO.NI I X80 /0) 8)
(320) _ 1 ,(480) I 13 H 118 SURVEYED BY I
a.auu.c N�
15 U4 0l (545) H S. W4SHBURN, 1856 m
° u.s.c.s.
u l_ (40001 "BERTRAM" M
T 9 S. 79.67 80711 (79 90) (87 99) i Lot. 33 22 42.50" N.
($ Long. 115° 46' 5741 "W. J
V (320)
8 A L TON - _, -.- 19 \.� , 2 F° <,. < 5fA °
o (704) (480)
5U ?YfYfO BY
80.09 (88.04)
f. C. MATTHMSDA, 1855 $ H.5. WASHBURN,1856 to
30 I 29 YB,..,., .. h
(704) ( (480) a m
V p -
(88.03) 7(77N
31 ( 32 .4 33 (704) (UV. O7) (6291 4.99
i (8L 78) (B/, 30) (81.30)
33° 20' + + + &I'MfWSON, 1855
0
0
R. 10 E. R. I I E.
I
i
d
60 40 0 e0 160 ?40
All triangulation stations are US a GS unless otherwise noted. -' Chains
where shown otherwise, area of each protracted section is 640 acres. Lines surveyed _-� — --
Data shown in parenthesis are determinations made from existing Ones protracted — — — —
information and subject to rectification. Horizontal Control Station Q
Planimetry added from U.S.G.S. topographic maps. Supplemental Horizontal Control Point 0
Shaded lines indicate boundaries of surveyed areas. Found Corner plotted from U.S G.S quadrangle +
Boundary Monument El
Mineral Monument e
a
0
s
N
+ 470,000
+ 410,000
O
.O
N
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Washington D.C. September 14, 1966
This diagram represents the official protraction of the rectangular system of survey of
the unsurveyed sections in the townships shown above, and is hereby approved
For The Director
Acting Chief, Division Of Engineering
IWIN
I
J
Diagram No. 15 —Zane VI
a