Loading...
cocc23025RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 811 Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 Mail Stop # 1080 DOC # 2023-0357520 . 11 /30/2023 03:04 PM Fees: $95.00 Page 1 of 6 Recorded in Official Records County of Riverside Peter Aldana Assessor -County Clerk -Recorder "This document was electronically submitted to the County of Riverside for recording" Receipted by: ELENA #448 APN 648-120-001 CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 23025 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined the Grant Deed recorded May 10, 2023 as Instrument Number 0134022, of Official Records of Riverside County, does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without further compliance with the Subdivision'Map-Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real property is located in the Countv of Riverside, State of California described as follows: SEEATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL Owner(s) of Record: Rangel Steel , Inc., a California Corporation Executed on 1?2ot,3 at Riverside, California Kerry G ay, Senior Sury yor County of Riverside Transportation Department DO.0 #2023-0357520 :Pa e'2 of 6 EXHIBIT A LEGAL DESCRIPTION - CERTIFICATE OF COMPLIANCE: NO. 2 For APN/Parcel 1D(s):..648420-001 . :THE LAND REFERRED TO HEREINBELOW IS SITUATED IN THE COUNTY.OF RIVERSIDE, STATE OF CALIFORNIA AND IS -DESCRIBED AS FOLLOWS: THAT PORTION' OF THE SOUTH HALF OF GOVERNMENT LOT 2 IN THE NORTHWEST QQAPT_,.ER OF SECTION 7, TOWNSHIP 4 SOUTH, RANGE .6. EAST, SAN BERNARDINO BAS.E,AND MERIDIAN,. ACCORDING. TO THE OFFICIAL PLAT THEREOF LYING NORTHERLY OF A LINE W14CPHS PARALLEL WITH AND-200 FEET NORTHERLY, MEASURED AT RIGHT -ANGLES/FROMHF FOLLOWING DESCRIBED LINE: BEGINNING; AT A POINT ON THE WEST LINE OF: THE NORTHWEST QUAR-TCR OF'SAtD SECTION: 7, DISTANT NORTH 000 15' 02" WEST 722.6 FEET FROM THE WEST jQVARTE43 GORNE:RQF SAID SECTION 7; . THENCE SOUTH 71 °.50' 47" EAST, TO A POINT ON THE -A,ST NINE O1S. SAiD-F�`gVERNMENT :LOT 2; EXCEPT -THE WESTERLY 40 FEET AS CONVEYED TO THE COU.NT�l OF RIVERSIDE, BY DEED 'RECORDED OCTOBER 31, 1966 AS INSTRUMENT NA W78,�, OF OFFI)CIAL RECORDS. Record Owner(s): Rangel Steel Inc Address:4776 Valley Forge Drive,' Riverside;. CA 92509 _ Phone Number: (909) 469-0078 Exhit it prepared bY�Aange[ Steel Inc Addre04776 Valley Forge _D:rive Riverside, CA 92509 Phone: Number; 9G9 469'_007 : -Assessor's. Parcel Number(s): 648-120-001 rOrM ZVO-1U14 (U3/Z3/10) DOC #2:023-0357520 Page 3; of 6 T4S,R6E,SEC 7 Record Owner(s)Rangel Steel Inc Address:4.776 Valley Forge Dr Jurupa Valley CA 92509 Phone Number: (009) 469-0078 Vicin.ity Map a' _u d Exhibit prepared byRanel Steel Inc Address: 4776 Valley Forge Dr Jurupa Valley CA 92509 Pho.re.Number: (909) 469-0078 With Scale: No Scale ` mo8ot pH Assessor's Parcel Number(s):648-120-001 - V.i'i:ek oa Nabwq Zone: M-C, CZ Number 6296 Maintained Per Road Book Page 183A and 1948 Road Book Page 106 See. Deed Plat 2' 7QQQ. DOC #2023-0357520 Page 4 of 6 11 /27/23 12:40 Plan: COCC23025 60. Prior To Grading Permit Issuance Riverside County PLUS CONDITIONS OF APPROVAL Page 1 Parcel: 648120001 Survey 060 - Survey.' 1 ACCESS RESTRICTION Not Satisfied CONDITION TEXT Lot access shall be restricted on Rio Del Sol Road, with the exception of one opening. The location shall be determined at the time the permit is pulled. Transportation 060 - Transportation. 1 CONDITIONAL WQMP Not Satisfied WQMP is not required for entitlement. However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on. http://rcflood.org/npdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the Transportation Department for review and approval. 060 - Transportation. 2 SUBMIT GRADING PLANS Not Satisfied The project proponent shall submit grading plans (24 in x 36 in) to the Building & Safety/Transportation Department for review and approval. If road right-of-way improvements are required, the project proponent shall submit street improvement plans for review and approval, open an IP account, and pay for all, associated fees in order to clear this condition. The Standard plan check turnaround time is typically 2-4 weeks. Approval is required prior to issuance of a grading permit. 80. Prior To Building Permit Issuance Survey 080 - Survey. 1 Access Easement Not Satisfied Provide a 30 foot wide access easement along the parcel's northern boundary to provide access for surrounding landlocked parcels. 080 - Survey. 2 ACCESS RESTRICTION Not Satisfied Lot access shall be restricted on Rio Del Sol Road, with the exception of one opening. The location shall be determined at the time the permit is pulled. 080 -Survey. 3 RIGHT-OF-WAY DEDICATION Not Satisfied Sufficient public street right-of-way along Rio Del Sol Road on the project side shall be conveyed for public use to provide for a 50 foot half -width right-of-way per Standard No. 94, Ordinance No. 461.11. or as approved by the Director of Transportation. 080 -Survey. 4 SURVEY MONUMENTATION Not Satisfied It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to install street centerline monuments as required by Riverside County Ordinance No. 461.11. If construction centerline differs, provide a tie to existing centerline of right-of-way. Prior to any construction, survey monuments including centerline monuments, tie points, property corners and benchmarks shall be tied out and a pre -construction corner record or record of survey filed with the County Surveyor pursuant to Section 8771 of the DOC #2023-0357520 Page 5 of 6 11 /27/23 12:40 Plan: COCC23025 80. Prior To Building Permit Issuance Riverside County PLUS CONDITIONS OF APPROVAL Survey 080 -Survey. 4 SURVEY MONUMENTATION (cont.) Business & Professional Code. Page 2 Parcel: 648120001 Not Satisfied In accordance with 6730.2 and 8771 (b) of the Business & Professional Code, survey monuments shall be preserved, and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be tied out and reset, and a post -construction corner record filed for those points prior to completion and acceptance of the improvements. All existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. Transportation 080 - Transportation. 1 CONDITIONAL WQMP Not Satisfied This condition applies if a grading permit is not required. Prior to issuance of a building permit, the owner/applicant may be required to submit a Water Quality management Plan (WQMP), on PDF, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. https://rcwatershed.org 90. Prior.to Building Final Inspection Transportation 090 - Transportation. 1 CONDITIONAL WQMP Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 Transportation. 2 REGIONAL TRANSPORTATION FEES Not Satisfied Prior to the time of issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 673. 4080 Lemon Street; 8 h Floor • Riverside, CA 92501 • (951) 955-6740 P.O.. Box 1090 -' Riverside, CA 925024090 • FAX (951) 955-3198