Loading...
cocc23052RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 8'h Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 . Mail Stop # 1080 DOC # 2024-0051513 02/26/2024 11:14 AM Fees: $0.00 Page 1 of 6 Recorded in Official Records County of Riverside Peter Aldana Assessor -County Clerk -Recorder '"This document was electronically submitted to the County of Riverside for recording" Receipted by: CRISTINA#7700 APN 463-074-005 CONDITIONAL CERTIFICATE OF COMPLIANCE NO: 23052' (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined the Grant Deed recorded January6, 2023 as Instrument Number 0004242, of Official Records of Riverside County, does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate (elates only to issues of compliance or noncompliance with the Subdivision Map Act.and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased; or financed without further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real is located iri the County of Riverside, State of California described as follows: SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL L f1 Owner(s) of Record: Paco O. Mireles and Crystal Mireles, Husband and Wife as Joint7enants Executed on 2 zY Zo24 at Riverside, California Kerry ray, Senior S eyor County of Riverside Transportation Department EXHIBIT "A" - LEGAL DESCRIPTION CERTIFICATE OF COMPLIANCE NO. 23052 Lot 12 and the East half of Lot 11 in Block 10 of the Town of Winchester, as shown by Map on File in Book 10, page 463 of Maps, in the County of Riverside, State of California, San Diego County records. Also known as: 33180 Wesley Street, Winchester, CA 92596 Record Owner(s): Crystal and Paco Mireles Address: 33180 Wesley Street, Winchester, CA 92596 Phone Number: (951) 400-2515 Exhibit prepared by: Marvin Barriga Address: 24568 Oenida Street, Moreno Valley, CA 92553 Phone Number: (951) 751-7813 Assessor's Parcel Number(s): 463-074-005 Form 295-1014 (03123115) -0 CU 0 a� U) m U C EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE NO. 23052 463-074-005 .25 Acres +/- MB 2/11 one story home 16' 10 in 75' M Wesley Street Record Owner(s): Crystal & Paco Mireles Address: 33180 Wesley Street, Winchester, CA 92596 Phone Number: (951) 400-2515 Exhibit prepared by: Marvin Barriga Address: 24568 Oenida Street, Moreno Valley, CA 92553 Phone Number: (951) 751-7813 Scale: Not to Scale Assessor's Parcel Number(s): 463-074-005 Zone: R-R Asbury St n' fc: Wesley St m Q m` t Taylor St Taylor S, Taylor St VICINITY MAP 0 Simpson Rd Simpson Rd S27, T5S, R2W 02/22/24 Riverside County PLUS Page 1 09:51 CONDITIONS OF APPROVAL Plan: COCC23052 60. Prior To Grading Permit Issuance Transportation 060 - Transportation. 1 CONDITIONAL WQMP Parcel: 463074005 Not Satisfied WQMP is not required for entitlement. However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on http://rcflood.org/npdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the Transportation Department for review and approval. 060 - Transportation. 2 SUBMIT GRADING PLANS Not Satisfied The project proponent shall submit grading plans (24 in x 36 in) to the Building & Safety/Transportation Department for review and approval. If road right-of-way improvements are required, the project proponent shall submit street improvement plans for review and approval, open an IP account, and pay for all associated fees in order to clear this condition. The Standard plan check turnaround time is typically 2-4 weeks. Approval is required prior to issuance of a grading permit. 80. Prior To Building Permit Issuance E Health 080 - E Health. 1 DEH- Health Clearance Not Satisfied 80-DEH CLEARANCE: Prior to issuance of the building permit, clearance must be obtained from the Department of Environmental Health. Any development of this site that requires plumbing must be able to provide an approved potable water source. If provided by a municipal purveyor, please provide current documentation that establishes water service. If using a water well, well must be properly permitted by this Department prior to construction or prior to being put into use as a potable water source. Please contact (951) 955-8980 for any additional details. Any development of structures with plumbing must provide an approved method of sewage disposal. If sewer is available, site must connect to sewer. If sewer is not available, applicant must meet the requirements of the Department and demonstrate that the use of an Onsite Wastewater Treatment System (OWTS) is viable on this property. This includes the submittal of a soils percolation report conducted in accordance with the Local Agency Management Program (LAMP) and any other required documents. Please contact this Department for additional details at (951) 955-8980. Survey 080 - Survey. 1 SURVEY MONUMENTATION Not Satisfied It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to install street centerline monuments as required by Riverside County Ordinance No. 461.11. If construction centerline differs, provide a tie to existing centerline of right-of-way. Prior to any construction, survey monuments including centerline monuments, tie points, property corners and benchmarks shall be tied out and a pre -construction corner record or record of survey filed with the County Surveyor pursuant to Section 8771 of the Business & Professional Code. In accordance with 6730.2 and 8771 (b) of the Business & Professional Code, survey monuments shall be preserved, and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be tied out and reset, and a post -construction corner record filed for those points prior to completion and 02/22/24 Riverside County PLUS Page 2 09:51 CONDITIONS OF APPROVAL Plan: COCC23052 80. Prior To Building Permit Issuance Parcel: 463074005 Survey 080 - Survey. 1 SURVEY MONUMENTATION (cont.) Not Satisfied acceptance of the improvements. All existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. Transportation 080 - Transportation. 1 Gen - Custom 80 TRANS COC Conditional WQMP x permit is not required. Not Satisfied x This condition applies if a grading Prior to issuance of a building permit, the owner/applicant may be required to submit a Water Quality management Plan (WQMP), on PDF, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. https:Hrcwatershed. org 90. Prior to Building Final Inspection Transportation 090 - Transportation. 1 CONDITIONAL WQMP Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 - Transportation. 2 REGIONAL TRANSPORTATION FEES Not Satisfied Prior to the time of issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 824. „t of eu * COUNTY OF RIVERSIDE y' TRANSPORTATION AND ''srox vpr LAND MANAGEMENT AGENCY Patricia Romo, P. E. Director of Transportation Case Number: Transportation Department COCC23052 Riverside County Surveyor's Office Attest: SIGNATURE Mike Nelson PRINTED NAME Engineering Technician II TITLE 2-22-24 Date: SIGNATURE Dennis Acuna, P.E., T.E. Deputy for Transportation,Capital Projects Russell Williams Deputy for Transportation/Planning and Development Paulette Izaguirre PRINTED NAME TITLE Enaineerina Technician I 4080 Lemon Street, 8” Floor • Riverside, CA 92501 - (951) 955-6740 P.O. Box 1090 • Riverside, CA 92502-1090 • FAX (951) 955-3198