cocc24010RECORDING REQUESTED BY
RIVERSIDE COUNTY
When recorded, return to:
Riverside County Transportation Department
Office of the County Surveyor
8'h Floor County Administrative Center
4080 Lemon Street, Riverside, CA 92501
Mail Stop # 1080
DOC # 2024-0094756
04/01 /2024 05:00 PM Fees: $0.00
Page 1 of 6
Recorded in Official Records
County of Riverside
Peter Aldana
Assessor -County Clerk -Recorder
"This document was electronically submitted
to the County of Riverside for recording"
Receipted by: TERESA #134
APN 427-340-058
CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 24010
(Section 21.2, Ordinance No. 460)
I certify that I have reviewed the following described real property and have determined the Grant Deed recorded
December 9, 2022 as Instrument Number 0497835, of Official Records of Riverside County, does not comply with
the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at
that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a
permit or other grant of approval for development of the property.
This certificate. relates only to issues of compliance or noncompliance with the Subdivision Map Act and local
ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without
further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate
of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of
a permit or permits, or other grant or grants of approval.
The real Drooerty is located in the Countv of Riverside. State of California described as follows:
SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL
Owner(s) of Record: Edgar Abel Vasquez Gonzalez
Executed on 3 3/ 2oZ4 at Riverside, California
Kerry dray, Senior Su eyor
County of Riverside Transportation Department
DOC #2024-009.4756 Page 2 of 6
CERTIFICATE OF COMPLIANCE
EXHIBIT "A" - LEGAL DESCRIPTION
CERTIFICATE OF COMPLIANCE NO.. 24010
SOUTHEAST QUARTER OF SOUTHEAST QUARTER OF SOUTHEAST QUARTER OF SOUTHWEST QUARTER,
SECTION 22 TOWNSHIP 4 SOUTH, RANGE 2 WEST, SAN BERNARDINO BASE AND MERIDIAN
Reicord Owner(s): tqU(-j,Y- Mom- OW-ZAt7-
-70
Address: J-1 �5, Ajb� qq jr (-0j. Ptrr'�Io OPr 09-5
Phone Number: CiJbi 65
Exhibit prepared b
y
Address: l�)
, re . 0, e-V (71--5 CAI -C1-2Z7'Z-
Plyone Number:
Assessor's Parcel Number(s): 340 — M�
Form 295-1014 (03/23/15)
DOC #2024-0094756 Page 3 of 6
EXHIBIT "B" - MAP
CERTIFICATE OF COMPLIANCE NO. 24010
v
�Q
Stagecoach Q V
V
`' '' • - . Rd •(Masta. 30, 130,
ped Tract No. 3227 •' • ) i
M B 53/55-57 •
Record Ownert51: ;�CnOU' 1*Mj V a7F(-jUCZ Ct0h-..0Lk4 .
Address: dl 5a-Ip 'R{Ve�r r `i�-e� r i s C t-N ct'z5`70
Phone Number: rt51-(3�ci55
1
Exhibit prepared' by
Address: �'� .
• '[ SX 2(p Y r i C g25?Z
Phone Number. Gis `` qw-b- -72x3
Scale: NO SCALE
Assessor's Parcel Number(s): )4 271 -
Zone: R-A-2 1/2, CZ Number 5696
Declaration of Dedication
1971-115925
T4S,R2W, SEC 22
Lot Dimensions Per assessors Map 427-34
Caballeros Canon, Public Rd, Per Resolution 90-35, Instrument # 1990-66368
03/19/24
09:19
Riverside County PLUS
CONDITIONS OF APPROVAL
DOC #2024-0094756 Page 4 of 6
Page 1
Plan: COCC24010
60. Prior To Grading Permit Issuance
Transportation
060 - Transportation. 1 CONDITIONAL WQMP
Parcel: 427340058
Not Satisfied
60 TRANS COC Conditional WQMP x x WQMP is not required for
entitlement. However, an approved WQMP is required prior to any grading or building permit, if
the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit
the applicable WQMP applicability checklist, found on http://rcflood.org/npdes/, if your project
proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than
1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the
Transportation Department for review and approval.
060 - Transportation. 2 SUBMIT GRADING PLANS
Not Satisfied
60 TRANS COC Submit Grading Plan& x The project proponent shall submit
grading plans (24 in x 36 in) to the Building & Safety/Transportation Department for review and
approval. If road right-of-way improvements are required, the project proponent shall submit
street improvement plans for review and approval, open an I account, and pay for all
associated fees in order to clear this condition. The Standard plan check turnaround time is
typically 2-4 weeks. Approval is required prior to issuance of a grading permit.
80. Prior To Building Permit Issuance
E Health
080 - E Health. 1 E Health Clearance
Not Satisfied
Prior to issuance of the building permit, clearance must be obtained from the Department of
Environmental Health -Any development of this site that requires plumbing must be able to
provide an approved potable water source. If provided by a municipal purveyor, please provide
current documentation that establishes water service. If using a well, well must be properly
permitted by this Department prior to being put into use as a potable water source. Please
contact (951) 955-8980 for any additional details.
Any development of structures with plumbing must provide an approved method of sewage
disposal.
If sewer is available, site must connect to sewer. If sewer is not available, applicant must
meet the requirements of the Department and demonstrate that the use of an Onsite
Wastewater Treatment System (OWTS) is viable on this property. This includes the submittal
of a soils percolation report conducted in accordance with the Local Agency Management
Program (LAMP) and any other required documents. Please contact this Department for
additional details at (951) 955-8980.
Fire
080 -Fire. 1
Prior to Issuance of a Building Permit
Not Satisfied
Submittal of construction plans to the Fire Department will be required. This will require a
separate permit application submitted directly to the Fire Department. This shall include a full
site plan including all fire apparatus access roads. Final fire and life safety, conditions will be
addressed when the Fire Department reviews these plans.. These conditions will be based on
California Fire Code, California Building Code (CBC), and related codes/standards adopted at
the time of construction plan submittal. Contact our office for submittal instructions.
Survey
080 - Survey. 1 SURVEY MONUMENTATION
Not Satisfied
03/19/24
09:19
DOC #2024-0094756. Page 5 of 6
Riverside County PLUS
CONDITIONS OF APPROVAL
Page 2
Plan: COCC24010
80. Prior To Building Permit Issuance
Survey
080 -Survey. 1- SURVEY MONUMENTATION (cont.)
Parcel: 427340058
Not Satisfied
80 SURVEY COC Survey Monumentation - x It shall be the responsibility of
the licensed professional legally authorized to practice land surveying work to install street
centerline monuments as required by Riverside County Ordinance No. 461.11. If construction
centerline differs, provide a tie to existing centerline of right-of-way. Prior to any construction,
survey monuments including centerline monuments, tie points, property corners and
benchmarks shall be tied out and a pre -construction corner record or record of survey filed
with the County Surveyor pursuant to Section 8771 of the Business & Professional Code.
In accordance with 6730.2 and 8771 (b) of the Business & Professional Code, survey
monuments shall be preserved, and a permanent monument shall be reset at the surface of
the new construction. Survey monuments destroyed during construction shall be tied out and
reset, and a post -construction corner record filed for those points prior to completion and
acceptance of the improvements. All existing survey monumentation in the proposed area of
disturbance (on -site or off -site) shall be shown on the project plans.
Transportation
080 - Transportation. 1 CONDITIONAL WQMP Not Satisfied
80 TRANS COC Conditional WQMP x x This condition applies if a grading
permit is not required.
Prior to issuance of a building permit, the owner/applicant may be required to submit a Water
Quality management Plan (WQMP), on PDF, if the development of the parcel(s) meets or
exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined
that a WQMP is required, the owner applicant shall be required to submit a WQMP and
associated plans for review and approval prior to issuance of building permit. More information
can be found at the following website.
https:Hrcwatershed.org
90. Prior to Building Final Inspection
Transportation
090 - Transportation. 1 CONDITIONAL WQMP
Not Satisfied
90 TRANS COC Conditional WQMP - x x If the project proposes to exceed
the impervious thresholds found in the WQMP guidance document, the applicant will be
required to acceptably install all structural BMPs and ensure that the requirements for
permanent inspection and maintenance the BMPs are established with a BMP maintenance
agreement.
090 - Transportation. 2 REGIONAL TRANSPORTATION FEES Not Satisfied
90 TRANS COC Regional Transportation Fees x x Prior to the time of
issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the
Project shall pay fees in accordance with the fee schedule in effect at the time of payment:
All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 824.
°-'
!� ` 60
T/ON O�Qt
PatriciaRonto, P.E.
Director of Transportation
DOC #2024-0094756 Page 6 of 6
COUNTY OF RIVERSIDE Dept�eforTransportationlCapital
TRANSPORTATIONAND Projects
LAND MANAGEMENT AGENCY Russell Williams
Deputyfor Transportation/Planning and
Development
Transportation Department
COCC24010
Case Number:
Riverside County Surveyor's Office
Attest:
SIGNATURE.
Mike Nelson
PRINTED NAME
Engineering Technician II
TITLE
3-10-24
Date:
SIGNATURE
Paulette Izaguirre
PRINTED NAME
'Engineering Technician
TITLE
4080 Lemon Street, 81' Floor • Riverside, CA 92501 • (951) 955-6740
P.O. Box 1090 • Riverside, CA 92502-1090 • FAX (951) 955-3198