cr24_1001CORNER RECORD Agency Index
Document Number
.;10�- lool
City of BEAUMONT County of RIVERSIDE , California
Brief Legal Description NILSEN COURT CUL—DE—SAC SEC. 5, T.3S.,R.1W.
CORNER TYPE COORDINATES (Optional)
N E.
❑ Government Corner
❑ Meander
Control Elevation
❑ Property Units
❑ Metric ❑ U.S. Survey Foot
❑ Rancho ❑ Other Horizontal Datum
Zone Epoch Date
Date of Survey 10/11 /23 & 1 /16/24 Vertical Datum
❑ Complies with Public Resources Code §§8801-8819
❑ Complies with Public Resources Code §§8890-8902
PLS Act Ref.: ❑ 8765(d) 8771 ❑ 8773 ❑ Other:
Corner/ ❑ Left as found ❑ Established ❑ Rebuilt Pre -Construction
Monument: ❑ Found and tagged 0 Reestablished N Referenced Post -Construction
Narrative of corner identified and monument as found, set, reset, replaced, or removed:
See sheet #2 for description (s):
This Corner Record
the
Sig
SURVEYOR'S STATEMENT
red by me or under my direction in conformance with
rs' Act on, 1 /22/2024
P.L.S.eF R.G.E. No. 5411
COUNTY SURVEYOR'S STATEMENT
This Corner Record was received :,-/ I
and examine
Signed
` Title
-/ 14, 2oti
• �� P.L.S. or-No.94&.71-'
Dep* GDunl $tlilYeyor
County Surveyor's Comment
LAND �
O �
o
No. 5411
*� Exp. 9/30/24 `*
9 CA-\
BPELSG-2016 Page 1 of 2
Document Number
, W . /ool
Agencylndex
REFERENCES AND LEGEND
R1 = COUNTY OF RIVERSIDE TRACT NO. 30891-1, M.B. 395/14-22
1 1 N.T.S.
22.01' -40.17'
18.19'l--
WW
co=)
Jp
Z U
MONUMENT NOTES
FD MAG NAIL, NO TAG, PER R1, FLUSH, BEFORE CONSTRUCTION. FD NOTHING, SET GEAR SPIKE &
WASHER STAMPED IS 5411" PER TIES HEREON, FLUSH, AFTER CONSTRUCTION.
FD LEAD, TACK & TAG, STAMPED IS 5346" IN TOP OF CURB, PER R1, BEFORE & AFTER
CONSTRUCTION.
® FD SCRIBED Y' IN TOP OF CURB, NO REFERENCE, SET LEAD, TACK & TAG IS 5411" IN TOP
OF CURB.
THE PURPOSE OF THIS RECORD IS TO DOCUMENT THE PERPETUATION OF FOUND MONUMENT(S) PURSUANT TO THE PLS ACT SECTION 8771.
NO CLAIM IS MADE REGARDING THE CORRECTNESS OF THE POSITION(S) OF SAID MONUMENT(S), NOR THE DIMENSIONAL RELATIONSHIP TO
STREET CENTERLINES OR PROPERTY BOUNDARIES. 23-VAN-031 RY
BPELSG-2016 Page 2 of 2