Loading...
cocc24029RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Rverade County Transportation Department Office of the County Surveyor 8° Floor County Administrative Center 4080 Lemon Street, Riverside, CA W501 Mad Stop a 1080 DOC # 2024-0179977 06/21/2024 12:46 PM Fees: $0.00 Page 1 of 7 Recorded in Official Records County of RNerskle Peter Adana assessor -County clerk -Recorder 'This emrmenl "a eMmnimlly submeed to Ilro County of Riverside for rewNirl ReceipteE by: ELEN4Y CONDITIONAL CERTIFICATE OF COMPLIANCE NO.24029 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined the Grant Deed recorded March 12, 2024 as Instrument Number 0068283, of Official Records of Riverside County, does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) Is/am to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the properly. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval SEE ATTACHED EXHIBITS W, °B", AND CONDITIONS OF APPROVAL Owner(s) of Record: Juan Gonzalez and Made Del Carmen Melchor Martinez, Husband and Wife as Joint Tenants Executed on G z r e 4 at Riverside, California �� —J Ke�Sei Surveyor 4/ County of Riverside Transportation Department DOC #2024-0179977. Page 2 017 , CENTIPIC1111AM. CCM UNCLE EXHIBIT "A" -LEGAL DESCRIPTION ,.CERTIFICATE OF COMPLIANCE NO. 24029 EXHIBIT'A' .. 'East 12 of the Northeast 1/4 of 1the Northwest 1/4 of the Southwest 1/4 of Radon W, Township 3 South,Range 5 East, San. Bernardino Wlaridlan, lying Northeast of Dillon Road, excluding -all: minerals as reserved to U-S-, In County of Aiven:ide, State of California, ACCording to the otfidal plat thereof. RaLDfd ownegep' J1W1QMYA s0MDMM1AD8.DAaMM Ma.CWOa MAelm6T . . AddreK:. --- 93666 eN1CH0VIBTHPDAPTAG4hIEDMLCrrYG8D31 Phone Number. -780476.5130 I,,6ilpmPsred by: 40SE RUSALCAVA - . Addresb: E2]WLAt.%1 RDPMWCAffi670 .. phone Ndmber: 809-223. 3 Asnessoes Parcel Numbepap 654-281-M . DOC #2024-0179977 Page 3 017 - -- DOC#2024-01799]] Page4cf7 06N11124 Riverside County PLUS Page 1 16,39 CONDITIONS OF APPROVAL Plan: COCC24029 60. Prior To Grading Permit Issuance Survey 080-Survey. 1 Access Restriction Lot access shall be restricted on Dillon Road, Transportation 060-Transportation. 1 Conditional WQMP Parcel: 654281003 . Not Satisfied Not Satisfied WQMP Is not required for entitlement. However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on httpl/rc600d.org/npdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the Transportation Department for review and approval. 060- Transportation. 2 Conditional WQMP Not Satisfied WQMP Is not required for entitlement However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on httpd/rcflood.org/npdes/, if your project proposesan auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the Transportation Department for review and approval. 060-Transportation. 3 Submit Grading Plans Not Satisfied The project proponent shall submit two sets of grading plans (24 in x 36 in) to the Transportation Department for review and approval. If road right-of-way improvements are required, the project proponent shall submit street improvement plans for review and approval, open an IF account, and pay for all associated fees in order to clear this condition. The Standard plan check turnaround time is 10 working days. Approval Is required prior to issuance of a grading permit. 060 -Transportation. 4 Submit Grading Plans Not Satisfied The project proponent shall submit two sets of grading plans (24 in x 36 in) to the Transportation Department for review and approval. If road right-of-way, improvements are required, the project proponent shall submit street Improvement plans for review and approval, open an IP account, and pay for all associated fees in order to clear this condition. The Standard plan check turnaround time is 10 working days. Approval is required prior to issuance of a grading permit. 80. Prior To Building Permit Issuance SUNey 080-Survey. 1 Access Restriction Not Satisfied Lot access shall be restricted on Dillon Road. 080-Survey. 2 Right -of -Way Dedication Not Satisfied Sufficient public street right-of-way along Dillon Road on the project side shall be conveyed for public use to provide for a 64 It half -width right-of-way per Standard No. 92, Ordinance No. 461.11. DOC #20240179977 Page 5 cf 7 0611824 Riverside County PLUS Page 2 15:39 CONDITIONS OF APPROVAL Plan: COCC24029 80. Prior To Building Permit Issuance Survey O80 - Survey. 2 Right -of -Way Dedication (cant.) or as approved by the Director of Transportation. Parcel: 654281003 Not Satisfied 080-Survey. 3 Survey Monumentation Not Satisfied It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to install street centerline monuments as required by Riverside County Ordinance No. 461.11. If construction centerline differs, provide a tie to existing centerline of nghtof-way. Prior to any construction, survey monuments including centedine monuments, tie points, property corners and benchmarks shall be tied out and a pre -construction comer record or record of survey fled with the County Surveyor pursuant to Section 8771 of the Business & Professional Code. In accordance with 6730.2 and 8T71 (b) of the Business & Professional Code, survey monuments shall be preserved, and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be Bed out and reset, and a post -construction corner record fled for those points prior to completion and acceptance of the improvements. All existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. 080-Survey. 4 Survey Monumentation Not Satisfied It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to Install street centedine monuments as required by Riverside County OrdinanceNo. 461.11. If construction centerline differs, provide a Be to existing centedine of rightof-way. Prior to any construction, survey monuments including centedine monuments, tie points, property comers and benchmarks shall be tied out and a pre -construction comer. record or record of survey filed with the County Surveyor pursuant to Section 8771 of the Business & Professional Code. In accordance with 6730.2 and 8771 (b) of the Business & Professional Code, survey monuments shall be preserved, and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be tied out and reset, and a post -construction corner record filed for those points prior to completion and acceptance of the improvements. All existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. Transportation 060-Transportation. 1 Conditional WQMP - Not Satisfied This condition applies if a grading permit is not required. Prior to Issuance of a building permit the owner/applicant may be required to submit a Water Quality management Plan (WQMP), on PDF, if the development of the parcels) meats or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More Information can be found at the following website. httpsJ/rcwatemhed.org 080- Transportation. 2 Conditional WQMP Not Satisfied DOC #2024-0179977 Page 6 of 7 06/18/24 Riverside County PLUS Page 3 15:39 CONDITIONS OF APPROVAL Plan: COCC24029 Parcel: 654281003 80. Prior To Building Permit Issuance Transportation 080-Transportation. 2 Conditional WQMP (cont.) Not Satisfied This condition applies if a grading permit is not required. Prior to issuance of a building permit, the owner/applicant may be required to submit a Water Quality management Plan (WQMP), on PDF, If the development of the parcels) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP Is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. https:/Ar atemhed.org 90. Prior to Building Final Inspection Transportation 090-Transportation. 1 Conditional WQMP Not Satisfied 9 the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090- Transportation. 2 Conditional WQMP Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 -Transportation. 3 Regional Transportation Fees Not Safisfied Prior to the time of Issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) In accordance with Ordinance No. 673. 090-Transportation. 4 Regional Transportation Fees Not Satisfied Prior to the time of issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 824.