cr23_0678CORNER RECORD Agency Index � 23 a 1 0 3
Document Number C,
lity of LAKE ELSINORE County of RIVERSIDE , California
Brief Legal Description MAIN STREET & PROSPECT STREET SEC. 7, T. 6 S., R. 4 W.
CORNER TYPE
❑ Government Corner Control
❑ Meander ❑ Property
❑ Rancho ❑ Other
Date of Survey 07/25/22 & 11 /02/22
N.
Elevation
Units
COORDINATES (Optional)
E.
❑ Metric [:]U.S. Survey Foot
Horizontal Datum
Zone Epoch Date
Vertical Datum
[]Complies with Public Resources Code §§8801-8819
[:]Complies with Public Resources Code §§8890-8902
PLS Act Ref.: ❑ 8765(d) 8771 ❑ 8773 ❑ Other:
Corner/ ❑ Left as found ❑ Established ❑ Rebuilt Pre -Construction
Monument: ❑ Found and tagged Reestablished Referenced Post -Construction
Narrative of corner identified and monument as found, set, reset, replaced, or removed:
See sheet #2 for description (s):
This Corner Record
the P
C
7 RVEYOR'S STATEMENT
pared by me or under my direction in conformance with
eyors' Act on 12/12/2022
P.L.S. 8F R.C= No. 5411
COUNTY SURVEYOR'S STATEMENT
Thy omer Record was received 2 2UZ3
and examined and filed
Signed %/ P.L.S. or 5.�. No. 90/7
Title Deputy County Surveyor
County Surveyor's Comment
V. D s�'�
G tf� a
No. 5411
Exp. 9/30/24
'-z
,E. H
No. 9017
EXP. 09-30-23
BPELSG-2016 Page 1 of 2
Document Number
-Vd 3 • 06,7 9
Agency Index
C�Z3o�o�
REFERENCES AND LEGEND
R1 = COUNTY OF RIVERSIDE CORNER RECORD 14-0542
( ) = RECORD DISTANCE PER R1
* = INDICATES VERIFIED MEASURED DISTANCF RY EDM
N.T.S.
ospE�T
RF�r
MONUMENT NOTES
FD DURANAIL & ALUMINUM WASHER STAMPED IS 7564" PER R1, FLUSH, BEFORE & AFTER
CONSTRUCTION.
0 FD LEAD & BRASS TAG STAMPED IS 7564" IN TOP OF CURB PER R1.
■ FD LEAD & BRASS TAG STAMPED IS 7564" IN WALK PER R1.
O SET LEAD, TACK & TAG IS 5411 " IN TOP OF CURB.
THE PURPOSE OF THIS RECORD IS TO DOCUMENT THE PERPETUATION OF FOUND MONUMENT(S) PURSUANT TO THE PLS ACT SECTION 8771.
NO CLAIM IS MADE REGARDING THE CORRECTNESS OF THE POST IONS) OF SAID MONUMENT(S), NOR THE DIMENSIONAL RELATIONSHIP TO
STREET CENTERLINES OR PROPERTY BOUNDARIES. 22-ALL-711 BKO
BPELSG-2016 Page 2 of 2