Loading...
cocc24040RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 8t' Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 Mail Stop # 1080 DOC # 2024-0304660 10/09/2024 12:29 PM Fees: $0.00 Page 1 of 6 Recorded in Official Records County of Riverside Peter Aldana Assessor -County Clerk -Recorder "This document was electronically submitted to the County of Riverside for recording" Receipted by: TERESA #134 APN 657-250-008 CONDITIONAL CERTIFICATE OF -COMPLIANCE NO. 24040 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined the Grant Deed recorded February 23, 2023 as Instrument Number 0051807, of Official Records of Riverside County, does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without, further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real property is located in the County of Riverside, State of California described as follows: SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL Owner(s) of Record: Jose Parra Delgado, a married man as his sole and -separate property Executed on /,9 7 2.o2'r at Riverside, California Kerry Gray, Senior Surveyor County of Riverside Transportation Department DOC #2024-0304660 Page 2 of 6 - CERTIFICATE 60r6MPLlAWCE- EXHIBIT "A" — LEGAL DESCRIPTION CERTIFICATE OF COMPLIANCE NO. 24040 -qr't vm6 10% CaVv6n , (:O..uv*y incorporrkted CAnA d Scx�CS '016"*J-S TyC W C)y-th hc ,kkf of tYvt Noy-j"we-s-v Guar -ter c4- -t-Vie, 0,�ay-iev- o-C- Noytv-NecA5- Oukaocv- tv\-e, 5 EaS-%-, -0 WY�69'00 - Ey'Cow-k- +Vve �pN-p U571-250-00� �1 Record Owner(s): i�RC %-.#1 2�-L(Address:- jl�75�. �-- 0Q�ed 4CA Siumcir qzPhone Number: �� E-01bit prepared; by: Address 'b 6�QS' Q, Sp rxY C Phone NLffib6f; Assessor's Parcel Number(s): Form 295-1014 (03123115) DOC #2024-0304660 Page 3 of 6 EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE No. 24.040 Record Owner(s): Address: tj- y _, Phone Number J`'� c� �� v4 Z Z,-d...c .Exhibit prepared by:_. Address:i 5g50 P-A �LS �t c-' Phone Number:. Scale: No Scale Assessor's. Parcel Number(s):� Zone: W-2 30' For Road Purposes, Per Road Abstracts DOC #2024-0304660 Page 4 of 6 09/19/24 11:21 Plan: COCC24040 60. Prior To Grading Permit Issuance Riverside County PLUS CONDITIONS OF APPROVAL Transportation 060 - Transportation. 1 Conditional WQMP Page 1 Parcel: 657250008 Not Satisfied WQMP is not required for entitlement. However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on http://rcflood.org/npdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre: If'a WQMP is required, submit a single file PDF on two-CD/DVD copies to the Transportation Department for review and approval. 060 - Transportation. 2 Submit Grading Plans Not Satisfied The project proponent shall submit two sets of grading plans (24 in x 36 in) to the Transportation Department for review and approval. If road right-of-way improvements are required, the project proponent shall submit street improvement plans for review and approval, .open an IP account, and pay for all associated fees in order to clear this condition. The Standard plan check turnaround time is 10 working days. Approval is required prior to issuance of a grading permit. 80. Prior To Building Permit Issuance Planning 080 - Planning. 1 Gen - Custom Not Satisfied Prior to permit issuance, a change of zone will -be required, change the zoning classification to Estate Density Residential (EDR), Very Low Density Residential (VLDR), Low Density Residential (LDR) to be consistent with. the Rural Residential land, use designation. Survey 080 -Survey. 1 Survey Monumentation Not Satisfied . It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to install street centerline monuments as required by Riverside County Ordinance No. 461.11. If construction centerline differs, provide a tie to existing centerline of right -of --way. Prior to any, construction, survey monuments including centerline monuments, tie points, property corners and benchmarks shall be..tied out and a pre -construction corner record or record of survey filed with the County Surveyor pursuant to Section 8771 of the Business & Professional Code.- --In accordance with 6730:2 and 8771 (b) of the Business & Professional Code, survey monuments shall be preserved,.and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be tied out and reset, and a post -construction corner record filed for those points prior to completion and acceptance of the improvements. All'existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. Transportation 080 - Transportation. 1 Conditional WQMP This condition applies if a grading permit is not required. Not Satisfied Prior to issuance of a building permit, the owner/applicant, may be required to submit a Water Quality management Plan (WQMP), on PDF, if the development of the parcel(s) meets or DOC #2024-0304660 Page 5 of 6 09/19/24 11:21 Plan: COCC24040 80. Prior To Building Permit Issuance Riverside County PLUS CONDITIONS OF APPROVAL Page 2 Parcel: 657250008 Transportation 080 -Transportation. 1 Conditional WQMP (cont.) Not Satisfied exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. ' .' https:Hrcwatershed.org 90. Prior to Building Final Inspection Transportation 090 - Transportation. 1 Conditional WQMP Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required.to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 - Transportation. 2 Regional Transportation Fees Not Satisfied Prior to the time of issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 673. i DOC #2024-030.4660 Page 6 of 6 OF FRUI s COUNTY OF RIVERSIDE • rroNTRANSPORTATIONAND o�OEe LAND MANAGEMENT AGENCY Dennis Acuna, P. E., T. E. Director of Transportation Transportation Department Case Number: COCC24040 Riverside County Surveyor's Office Attest: r r I SIGNATURE Mike Nelson PRINTED NAME; Engineering Technician II TITLE Hector D. Davila, P.E. Deputyfor Transportation/Capital Projects Russell Williams Deputyfor Transportation/Planning and Development Date: SIGNATURE . Yimiao Wang PRINTED NAME Engineering Technician II TITLE 4080 Lemon Street, 81iFloor • Riverside, CA 92501 • (951) 955-6740 P.O. Box 1090 • Riverside, CA 92562-1090 • FAX (951) 955-3198