Loading...
cocc24086DOC # 2025-0036283 02/05/2025 01:52 PM ,Fees. =$0.00 ....Page 1 of 6 -Recorded in Official Records s RECORDING REQUESTED BY: County of Riverside RIVERSIDE. COUNTY :: Peter Aidana Assessor -County Clerk_,Recorder When recorded, return to: 'Riverside County Transportation Department "Thisdocumencwas electronically submitted - rdi g . . Offlge'ofthe County Surveyor, to the County ofRiverside_for-reco n " :. 81h Floor County Administrative Center Receipted by: ANGEE_ENE1868 :4080 Lemon Street, Riverside, CA 92501: .. :. :. Mail Stop # 1080 APN 576=350-006 CONDITIONAL.CERTIFICATE OF_ COMPLIANCE NO.:24086. (Section 21:2, Ordinance No: 460) 1 certify that I have: reviewed the following described real property and have determined the Grant Deed recorded December 2,2024, as Instrument Number 0366867 , of Official. Records of Riverside.County, does not comply with the provisions. of the Subdivision- Map Act and Riverside County land division ordinances that were applicable at .:. that time.,. The attached conditions) is/are to be fulfilled and implemented_ : prior to subsequent' issuance of` a ermit or other rant of :a roval for deivelo ment of the rope P 9 pP P . property. This certificate relates only to. issues of compliance or noncompliance. with the Subdivision Map Act and local ' ordinances enacted pursuant thereto. The parcel described herein may be sold, leased., or financed without- .. further compliance.with,the Subdivision :Map Act or any local.ordinance enacted pursuant thereto. This Certificate* of Compliance does, not grant the right to. develop the parcel. Development of the parcel, may require issuance of a permit or permits, or other grant or-grants.of approval. The real property is located in -the C6untyof Riverside, State of California describe6as follows' SEE ATTACHED EXHIBITS ,,A', "B' % AND CONDITIONS -OF APPROVAL Owner(s)of Record:.Eclipse Homes; LL.C. ..- ;. Executed on O -©+U Z5 at Riverside; California . Steve Chaffin, Senior Land -Surveyor County of Riverside Transportation Department ..... DOC #2025-0036283of 6 CERTIFICATE OF COMPLIANCE Form 295-1014 (03123115) DOC-#2025-0036283 Page 3 of 6 DOC #2025-003628 3- Page 4 of 6 02/03/25 Riverside County PLUS Page 1. 12,34 'CONDITIONS OF APPROVAL. . Plan:- COCC24086 Parcel:-576350006 60:.Prior To Grading Permit Issuance ... .. Fire .... - .. .... a 060 = Fire. 1 Prior to' grading - Hazardous: Vegetation and Fuel ManagNot Satisfied Projects in the Local Responsibility Area Very High Fire Hazard, Severity Zone and the State Responsibility Area Very High, High and Moderate Fire Hazard Severity Zones shall provide a Final Hazardous Vegetation and Fuel Management Plan to be, reviewed and approved by the Fire Department. Contact our office for submittal instructions. Transportation 060 - Transportation... 1: Conditional WQMP Not Satisfied .. -WQMP is not. required for entitlement. However, an approved WQMP is required prior to any: grading or building permit, if the development -of the parcel meets or exceeds any of the _ thresholds for a WQMP.: Submit the applicable WQMP applicability checklist, found on http://rcflood:orglhpdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP. is required, :submit a single file PDF'on.two CD/DVD copies to the Transportation Department for review and approval. . 060-= Transportation.-2 Submit Grading Plans Not Satisfied . The project proponent. shall submit. two sets of grading plans (24 in x 36 in) to the . Transportation Department:for review and approval. If road right=of--:way improvements. are required;'the project proponent shall submit street improvement plans for review and Approval,. open an IP. account, and pay for all associated fees in order to clear this condition. The Standard. plan check turnaround time is 10 working days. Approval is required prior to issuance of a grading permit. . 80. Prior To Building Permit Issuance :..: E Health 080 - E Health. 1 DEH- Health Clearance Not Satisfied Prior to issuance 'of the building permit,. clearance must be'obtained from the Department of Environmental Health.. Any development of this site that requires plumbing must be able.to provide an approved.potable.water source and wastewater collection. If provided by a municipal purveyor,. please provide current documentation that establishes water service:: If - using a water well, well must be properly permitted by this Department prior to. construction .or prior to being put into use as a potable water source: Must meet requirements of Ordinance :.... 682. Please contact (951) 955-8980 for any'additional details. Any development of structures with plumbing must.provide an approved method of sewage. disposal. If sewer is available, site must connect to sewer. If sewer is not available, applicant must meet the requirements of the Department and demonstrate that the, use of an Onsite Wastewater Treatment System OWT.S is viable on this roe This includes: the submittal .of a soils ercolation re ort i conducted in accordance with the. Local, Agency Management Program (LAMP) and any other i required documents. All substandard septic system will be required to be brought into _ compliance. Please:contact this Department for additional details at (951) 955-8980. . Commercial Projects.- OWTS proposed for commercial projects must have projected waste j flows under 10,000, gallons per day. Calculation of waste flows must be included in the OWTS report. c. Single Lot Developments ; .Lots created prior'to the implementation of this LAMP or. previously adopted versions as per the requirements of the OWTS policy, are not subject to :. j the aforementioned minimum lot size requirements, however they are subject to the design requirements this LAMP. d. Additional single-family dwelling unit (Including ADUs,. JADUs, i q 9 Y. 9 (• ..9 i etc.) on the same parcel that does not comply with a minimum density requirement of 0.5 acre DOC #2025-0.036283 Page 5 of .6. 02103725 Riverside County PLUS Page'2 a 1234 CONDITIONS OF APPROVAL. Plan:. COCC24086 .. Parcel::576350006 i .. 80. Prior To Building .Permit Issuance E Health 080 - E Health. V DEH- Health Clearance (coat.) ,' ;' Not Satisfied (gross) per dwelling unit will be required to utilize an ATS. See Chapter 6: for additional details... Fire 080.- Fire. 1 Prior,to permit - Fire Department -Plan Review: Not Satisfied.' Submittal of construction: plans to the Fiee.Department will be required. This will require -a separate permit application submitted directly to the Fire Department:.This shall include a. full site plan including all fire apparatus access roads. Final fire and life safety conditions will be Addressed when the Fire Department reviews these plans: -These conditions will be based on .. California Fire Code, California Building Code (CBC), and related.codes/standards adopted at the time of construction plan -submittal. Contact our office for submittal instructions:: 080-- Fire. 2 Prior to permit - Hazardous Vegetation and Fuel ManageNot Satisfied' An iris ion of the requirements of the final Hazardous Vegetation and Fuel Management Plan.is required before -permit issuance. Contact -our office for instructions regarding this .. inspection. _ Transportation 080 - Transportation. 1 Conditional WQMP Not Satisfied :This condition applies if a grading .permit is not required: - Prior to issuance of a building permit, the owner/applicant may be_required to submit a Water Quality management Plan (WQMP), on PDF; if the development of the parcel(s) meets or exceeds any:of the:thresholds outlined in the WQMP, guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and. .. associated plans for review and approval prior to issuance of building permit. More information. can be found at the following website. - https:!/rcwat' Med.org 90..Prior to Building Final Inspection Transportation - 090 - Transportation..1 Conditional WQMP. Not Satisfied ::If the project proposes to exceed. the impervious thresholds found in the WQMP: guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection. and maintenance the BMPs are established with a BMP maintenance agreement. 090:- Transportation::2 Regional Transportation Fees Not Satisfied. Prior to the time of issuance.of a Certificate: of Occupancy or upon final inspection,, .whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time Of payment: I _XI.Transportation Uniform Mitigation Fees (TUMF) id accordance.with Ordinance -No. 824.