Loading...
cocc24106RECORDING REQUESTED BY RIVERSIDE COUNTY When recorded, return to: Riverside County Transportation Department Office of the County Surveyor 81" Floor County Administrative Center 4080 Lemon Street, Riverside, CA 92501 Mail Stop # 1080 DOC # 2025-0188022 06/23/2025 02:24 PM Fees: $0.00 Page 1 of 8 Recorded in Official Records County of Riverside Peter Aldana Assessor -County Clerk -Recorder "This document was electronically submitted to the County of Riverside for recording" Receipted by: ALEJANDRA#1032 APN 289-180-016 CONDITIONAL CERTIFICATE OF COMPLIANCE NO. 24106 (Section 21.2, Ordinance No. 460) I certify that I have reviewed the following described real property and have determined the Grant Deed recorded September 23, 2024 as Instrument Number 0286359, of Official Records of Riverside County, does not comply with the provisions of the Subdivision Map Act and Riverside County land division ordinances that were applicable at that time. The attached condition(s) is/are to be fulfilled and implemented prior to subsequent issuance of a permit or other grant of approval for development of the property. This certificate relates only to issues of compliance or noncompliance with the Subdivision Map Act and local ordinances enacted pursuant thereto. The parcel described herein may be sold, leased, or financed without further compliance with the Subdivision Map Act or any local ordinance enacted pursuant thereto. This Certificate of Compliance does not grant the right to develop the parcel. Development of the parcel may require issuance of a permit or permits, or other grant or grants of approval. The real property is located in the County of Riverside, State of California described as follows: SEE ATTACHED EXHIBITS "A", "B", AND CONDITIONS OF APPROVAL Owner(s) of Record: Jose Godinez, a single man Executed on 06-13-2025 at Riverside, California Steve Chaffin, Senior Land Surveyor County of Riverside Transportation Department DOC #2025-0188022 Page 2 of 8 CERTIFICATE ATE OF UUMP I NUh - EXHIBIT "A" — LEGAL DESCRIPTION CERTIFICATE OF COMPLIANCE NO. 24106 4th W-D- 04.-mgy� f6'�V-v <( t" Led o woivtor) the 1 and trrt.�-�b ht(On be,10W is 5-aMOIICa ty) the CDunrtj of '�tYe���a�, S�qte $� CA1tfDY�li� Und iS ��SG�ib� Us�libwS = IN UAJerly -62t ,qo �eej 04 par(el 3 6-F pare( reap 1102b &1S YeCKAJ 'W) WDY S(o) Pee 53 o4 p4r(d mqp , FeeorA� a-� glversAe W&J, CA iiforn i4 , "The m4erl lint D+ s.id U4eO� 32(v.gp �e�j beinj me L4ttA p-4rollel -11 anal Af Yi�h� �n�les �1n� ��rl� 1in� of sa��r� 1w:).) 0+1 CAVN bven0i ni; fecoy fir 2Bq—ISO- DIW Record Owner(s): Jose L . Ow� i ne Z Address: 47000 Phone Number: Exhibit prepared by-jov- Address: /��� ii✓i%/dw�/von L� /�'lv,�/�O ��i%��f Phone Number: (90 Assessor's Parcel Number(s): 'M -- 1 So - C) b Form 295-1014 (03/23/151 DOC #2025-0188022 Page 3 of 8 EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE NO. N 1 W-•�� E S COCC 3.4 lab M-iOo-ab A 6- 4acn ��4 tmr� W--------- a v, 60' PER MB 103/73-81 60' 40 per PM 83/25-26 Record Owner(s)jp L, e---�IZ Address: 6vi/�owbra�i� Lrl Iylolr/ro �/v//�y" (V 9; Phone Nu ber0-ro Exhibit prepared by: Address: /a �p W�'/loW6roo,E Gh. n�arr�0 U9�%y� elf 9.-ts.0 Phone Number:�a--3p- y09 Scale: kb scqv—& Q Assessor's Parcel Number(s): X8 l - I w -01 b zone: k_ A- 51 CZ 00*lber 60& SEC ;4. T 0 z z c m v DOC #2025-0188022 Page 4 of 8 EXHIBIT "B" - MAP CERTIFICATE OF COMPLIANCE NO. 24106 60' PER MB 103/73-81 PM 111 /J16-17 3500' + 4 _ o / o_ � r' 0 / i/ O O z 60' rr G) < K PER PM m v o 101 /70-71 0 Cn D 0 0 y / z m 0 v z / z c m v N I W--e N.- E Assessor`s Parcel Numberts): 289-180-016 S DOC #2025-0188022 Page 5 of 8 05/19/25 12:50 Plan: COCC24106 60. Prior To Grading Permit Issuance Riverside County PLUS CONDITIONS OF APPROVAL Page 1 Parcel: 289180016 Fire 060 -Fire. 1 Fire Access Not Satisfied This parcel is located in the SRA Very High Fire Severity Zone and the fire access road must comply with Title 14 CCR § 1273.01 - 1273.08 regarding width, surface, grades, radius, turnarounds, dead-end roads. Secondary access is required. Transportation 060 - Transportation. 1 Conditional WQMP Not Satisfied WQMP is not required for entitlement. However, an approved WQMP is required prior to any grading or building permit, if the development of the parcel meets or exceeds any of the thresholds for a WQMP. Submit the applicable WQMP applicability checklist, found on http://rcflood.org/npdes/, if your project proposes an auto -repair shop, adding 5,000 sq.ft. of impervious area, or disturbing more than 1 acre. If a WQMP is required, submit a single file PDF on two CD/DVD copies to the Transportation Department for review and approval. 060 - Transportation. 2 Submit Grading Plans Not Satisfied The project proponent shall submit two sets of grading plans (24 in x 36 in) to the Transportation Department for review and approval. If road right-of-way improvements are required, the project proponent shall submit street improvement plans for review and approval, open an I P account, and pay for all associated fees in order to clear this condition. The Standard plan check turnaround time is 10 working days. Approval is required prior to issuance of a grading permit. 80. Prior To Building Permit Issuance E Health 080 - E Health. 1 DEH- Health Clearance Not Satisfied Prior to issuance of the building permit, clearance must be obtained from the Department of Environmental Health. Any development of this site that requires plumbing must be able to provide an approved potable water source and wastewater collection. If provided by a municipal purveyor, provide current documentation that establishes water service. If using a water well, well must be properly permitted by this Department prior to construction or prior to being put into use as a potable water source. Must meet requirements of Ordinance 682. Please contact (951) 955-8980 for any additional details. Any development of structures with plumbing must provide an approved method of sewage disposal. If sewer is available, site must connect to sewer. If sewer is not available, applicant must meet the requirements of the Department and demonstrate that the use of an Onsite Wastewater Treatment System (OWTS) is viable on this property. This includes the submittal of a soils percolation report conducted in accordance with the Local Agency Management Program (LAMP) and any other required documents. All substandard septic system will be required to be brought into compliance. Please contact this Department for additional details at (951) 955-8980. — OWTS proposed for commercial projects must have projected waste flows under 10,000 gallons per day. Calculation of waste flows must be included in the OWTS report. c. Single Lot Developments - Lots created prior to the implementation of this LAMP or previously adopted versions as per the requirements of the OWTS policy, are not subject to the aforementioned minimum lot size requirements, however they are subject to the design requirements of this LAMP. d. Additional single-family dwelling unit (including ADUs, JADUs, etc.) on the same parcel that does not comply with a minimum density requirement of 0.5 acre (gross) per dwelling unit will be required to utilize an ATS. See Chapter 6 for additional details. Water wells DOC #2025-0188022 Page 6 of 8 05/19/25 12:50 Plan: COCC24106 80. Prior To Building Permit Issuance E Health Riverside County PLUS CONDITIONS OF APPROVAL Page 2 Parcel: 289180016 080 - E Health. 1 DEH- Health Clearance (cont.) Not Satisfied for commercial use shall first obtain approval prior to construction or placed in use for drinking water purposes. Fire 080 -Fire. 1 Fire Access Not Satisfied This parcel is located in the SRA Very High Fire Severity Zone and the fire access road must comply with Title 14 CCR § 1273.01 - 1273.08 regarding width, surface, grades, radius, turnarounds, dead-end roads. Secondary access is required. Survey 080 -Survey. 1 Right -of -Way Dedication Not Satisfied Sufficient public street right-of-way along the southern boundary shall be conveyed for public use to provide for a 30 ft half -width right-of-way per Standard No. 105C, Ordinance No. 461.11. or as approved by the Director of Transportation. 080 -Survey. 2 Survey Monumentation Not Satisfied It shall be the responsibility of the licensed professional legally authorized to practice land surveying work to install street centerline monuments as required by Riverside County Ordinance No. 461.11. If construction centerline differs, provide a tie to existing centerline of right-of-way. Prior to any construction, survey monuments including centerline monuments, tie points, property corners and benchmarks shall be tied out and a pre -construction corner record or record of survey filed with the County Surveyor pursuant to Section 8771 of the Business & Professional Code. In accordance with 6730.2 and 8771 (b) of the Business & Professional Code, survey monuments shall be preserved, and a permanent monument shall be reset at the surface of the new construction. Survey monuments destroyed during construction shall be tied out and reset, and a post -construction corner record filed for those points prior to completion and acceptance of the improvements. All existing survey monumentation in the proposed area of disturbance (on -site or off -site) shall be shown on the project plans. Transportation 080 - Transportation. 1 Conditional WQMP This condition applies if a grading permit is not required. Not Satisfied Prior to issuance of a building permit, the owner/applicant may be required to submit a Water Quality management Plan (WQMP), on PDF, if the development of the parcel(s) meets or exceeds any of the thresholds outlined in the WQMP guidance document. If it is determined that a WQMP is required, the owner applicant shall be required to submit a WQMP and associated plans for review and approval prior to issuance of building permit. More information can be found at the following website. https://rcwatershed.org 90. Prior to Building Final Inspection DOC #2025-0188022 Page 7 of 8 05/19/25 Riverside County PLUS Page 3 12:50 CONDITIONS OF APPROVAL Plan: COCC24106 Parcel: 289180016 90. Prior to Building Final Inspection Transportation 090 - Transportation. 1 Conditional WQMP Not Satisfied If the project proposes to exceed the impervious thresholds found in the WQMP guidance document, the applicant will be required to acceptably install all structural BMPs and ensure that the requirements for permanent inspection and maintenance the BMPs are established with a BMP maintenance agreement. 090 - Transportation. 2 Regional Transportation Fees Not Satisfied Prior to the time of issuance of a Certificate of Occupancy or upon final inspection, whichever occurs first, the Project shall pay fees in accordance with the fee schedule in effect at the time of payment: All Transportation Uniform Mitigation Fees (TUMF) in accordance with Ordinance No. 824. DOC #2025-0188022 Page 8 of 8 OF RtVf�B COUNTYOF RIVERSIDE Hectors Davila,P.E. sw f Ueputyfor TiProjects otatron/Caprtal TRANSPORTATIONAND LAND MANAGEMENTAGENCY Russel! tati /P Deputyfor Transportationrt/Planning and Dennis Acuna, P. E., T. E. Development Director oj'Transportation Transportation Department case Number: COCC24106 Riverside County Surveyor's Office Attest: SIGNATURE Mike Nelson PRINTED NAME Senior Engineering Technician TITLE Date: 06-13-2025 P/- SIGNATURE Yimiao Wang PRINTED NAME Senior Engineering Technician TITLE 4080 Lemon Street, P Floor Riverside; CA 92501 • (951) 955-6740 P.O. Box 1090 • Riverside, CA 92502-1090 - FAX (951) 955-3198